WHO PQS Solar Vaccine Cold-Chain Distribution

Product family: 2–8°C Passive Carrier Hubs.

Flow: UNICEF / GAVI Port Arrival → VVM Vial Monitor Check → National Walk-In Cold Store → Long-Life Passive Box Pack → Regional 4x4 Cold Transport → Clinic Fridge Temp Log Sync → Rural Health Clinics

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: WHO PQS Solar Vaccine Cold-Chain DistributionSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. UNICEF / GAVI Port Arrival → VVM Vial Monitor Check (135 s) → National Walk-In Cold Store (206 s) → Long-Life Passive Box Pack (147 s) → Regional 4x4 Cold Transport (166 s) → Clinic Fridge Temp Log Sync (112 s) → Rural Health Clinics.SUPPLIERUNICEF / GAVIPort ArrivalI0.70 d1VVM Vial MonitorCheckC/T 135 sI1.40 d2National Walk-InCold StoreC/T 206 sI1.20 d3Long-Life PassiveBox PackC/T 147 sI0.80 d4Regional 4x4 ColdTransportC/T 166 sI0.50 d5Clinic FridgeTemp Log SyncC/T 112 sI0.70 dCUSTOMERRural HealthClinics280 / crates

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. VVM Vial Monitor Check135 s10 min96%98.8%112196 (0.70 d)369
2. National Walk-In Cold Store206 s15 min87%95.0%140392 (1.40 d)209
3. Long-Life Passive Box Pack147 s8 min94%98.4%84336 (1.20 d)330
4. Regional 4x4 Cold Transport166 s8 min92%97.6%56224 (0.80 d)279
5. Clinic Fridge Temp Log Sync112 s10 min96%99.1%70140 (0.50 d)438

Key figures

Takt time
193 s
Lead time
5.31 d
Value-added time
766 s
Process cycle efficiency (PCE)
0.27%
Rolled throughput yield (RTY)
89.3%
Customer demand per day
280 crates
Line capacity per day
209 crates
Bottleneck
National Walk-In Cold Store

Reading the bottleneck

The bottleneck is "National Walk-In Cold Store": it can process 209 crates per day against a demand of 280 crates, so it falls short of demand by 25.2%. Once downtime and scrap are counted, its cycle time grows from 206 s to 249 s, against a takt of 193 s. The largest loss at this step is equipment downtime (uptime 87%), about 30.8 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Cold-Chain & Temperature Logistics: Cold-Chain & Temperature Logistics