Night-Shift +2°C Fresh Dairy Cross-Docking
Product family: No-Storage Just-in-Time Dairy.
Flow: 5 Regional Dairies → High-Speed Reefer Inbound → Roller Dolly Scan-by-Store → Short Hold Buffer Allocation → Multi-Store Route Staging → Pre-Dawn Silent Store Drop → 600 Neighborhood Grocers
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. High-Speed Reefer Inbound | 6.1 s | 10 min | 96% | 98.8% | 2,480 | 4,340 (0.70 d) | 8,163 |
| 2. Roller Dolly Scan-by-Store | 9.3 s | 15 min | 87% | 95.0% | 3,100 | 8,680 (1.40 d) | 4,639 |
| 3. Short Hold Buffer Allocation | 6.6 s | 8 min | 94% | 98.4% | 1,860 | 7,440 (1.20 d) | 7,344 |
| 4. Multi-Store Route Staging | 7.5 s | 8 min | 92% | 97.6% | 1,240 | 4,960 (0.80 d) | 6,178 |
| 5. Pre-Dawn Silent Store Drop | 5.1 s | 10 min | 96% | 99.1% | 1,550 | 3,100 (0.50 d) | 9,626 |
Key figures
- Takt time
- 8.7 s
- Lead time
- 5.30 d
- Value-added time
- 34.6 s
- Process cycle efficiency (PCE)
- 0.012%
- Rolled throughput yield (RTY)
- 89.3%
- Customer demand per day
- 6,200 crates
- Line capacity per day
- 4,639 crates
- Bottleneck
- Roller Dolly Scan-by-Store
Reading the bottleneck
The bottleneck is "Roller Dolly Scan-by-Store": it can process 4,639 crates per day against a demand of 6,200 crates, so it falls short of demand by 25.2%. Once downtime and scrap are counted, its cycle time grows from 9.3 s to 11.3 s, against a takt of 8.7 s. The largest loss at this step is equipment downtime (uptime 87%), about 1.4 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Cold-Chain & Temperature Logistics: Cold-Chain & Temperature Logistics
- Temperature-Controlled Cold Hub Distribution
- -80°C Ultra-Cold Gene Therapy Cryo Relay Hub
- Harbor Fresh Catch Icing & Air Export Cold Hub
- Pressurized Ethylene Banana Ripening Cold Rooms
- -25°C Automated Clad-Rack Deep-Freeze Hub
- 4°C Fresh Cut-Flower Vacuum Cool & Bouquet Hub
- National Blood Bank Platelets & FFP Cold Hub
- Global Clinical Trial Frozen Biopsy Courier Hub
- Chilled Ingredient Meal-Kit Recipe Assembly Hub
- -28°C Direct-Store-Delivery Ice Cream Depot
- WHO PQS Solar Vaccine Cold-Chain Distribution