Harbor Fresh Catch Icing & Air Export Cold Hub

Product family: Insulated Air-Freight Fish Boxes.

Flow: North Sea Fishing Auctions → 0°C Slurry Ice Dock Check → Veterinary Border Health Cert → Leak-Proof Liner & Gel Pack → Airline Cooled ULD Build → Ramp Priority Hold Dispatch → Tokyo / Paris Fish Markets

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Harbor Fresh Catch Icing & Air Export Cold HubSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. North Sea Fishing Auctions → 0°C Slurry Ice Dock Check (58.0 s) → Veterinary Border Health Cert (89.0 s) → Leak-Proof Liner & Gel Pack (63.0 s) → Airline Cooled ULD Build (71.0 s) → Ramp Priority Hold Dispatch (48.0 s) → Tokyo / Paris Fish Markets.SUPPLIERNorth SeaFishingAuctionsI0.70 d10°C Slurry IceDock CheckC/T 58.0 sI1.40 d2Veterinary BorderHealth CertC/T 89.0 sI1.20 d3Leak-Proof Liner& Gel PackC/T 63.0 sI0.80 d4Airline CooledULD BuildC/T 71.0 sI0.50 d5Ramp PriorityHold DispatchC/T 48.0 sI0.70 dCUSTOMERTokyo / ParisFish Markets650 / crates

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 0°C Slurry Ice Dock Check58.0 s10 min96%98.8%260455 (0.70 d)859
2. Veterinary Border Health Cert89.0 s15 min87%95.0%325910 (1.40 d)485
3. Leak-Proof Liner & Gel Pack63.0 s8 min94%98.4%195780 (1.20 d)769
4. Airline Cooled ULD Build71.0 s8 min92%97.6%130520 (0.80 d)653
5. Ramp Priority Hold Dispatch48.0 s10 min96%99.1%163325 (0.50 d)1,023

Key figures

Takt time
83.1 s
Lead time
5.31 d
Value-added time
329 s
Process cycle efficiency (PCE)
0.11%
Rolled throughput yield (RTY)
89.3%
Customer demand per day
650 crates
Line capacity per day
485 crates
Bottleneck
Veterinary Border Health Cert

Reading the bottleneck

The bottleneck is "Veterinary Border Health Cert": it can process 485 crates per day against a demand of 650 crates, so it falls short of demand by 25.4%. Once downtime and scrap are counted, its cycle time grows from 89.0 s to 108 s, against a takt of 83.1 s. The largest loss at this step is equipment downtime (uptime 87%), about 13.3 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.