-80°C Ultra-Cold Gene Therapy Cryo Relay Hub

Product family: Liquid-N2 Dry-Shipper Dewars.

Flow: Cell & Gene Therapy CDMOs → LN2 Vapor Dewar Charging → Chain-of-Identity Barcode → Cryo Transfer Airlock -80°C → Real-Time Dual GPS Probe → Hospital Direct Courier Fly → Oncology Infusion Centers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: -80°C Ultra-Cold Gene Therapy Cryo Relay HubSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Cell & Gene Therapy CDMOs → LN2 Vapor Dewar Charging (840 s) → Chain-of-Identity Barcode (1,284 s) → Cryo Transfer Airlock -80°C (912 s) → Real-Time Dual GPS Probe (1,032 s) → Hospital Direct Courier Fly (696 s) → Oncology Infusion Centers.SUPPLIERCell & GeneTherapy CDMOsI0.69 d1LN2 Vapor DewarChargingC/T 840 sI1.40 d2Chain-of-IdentityBarcodeC/T 1,284 sI1.20 d3Cryo TransferAirlock -80°CC/T 912 sI0.80 d4Real-Time DualGPS ProbeC/T 1,032 sI0.51 d5Hospital DirectCourier FlyC/T 696 sI0.69 dCUSTOMEROncologyInfusion…45 / crates

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. LN2 Vapor Dewar Charging840 s10 min96%98.8%1831 (0.69 d)59
2. Chain-of-Identity Barcode1,284 s15 min87%95.0%2363 (1.40 d)34
3. Cryo Transfer Airlock -80°C912 s8 min94%98.4%1454 (1.20 d)53
4. Real-Time Dual GPS Probe1,032 s8 min92%97.6%936 (0.80 d)45
5. Hospital Direct Courier Fly696 s10 min96%99.1%1123 (0.51 d)70

Key figures

Takt time
1,200 s
Lead time
5.38 d
Value-added time
4,764 s
Process cycle efficiency (PCE)
1.6%
Rolled throughput yield (RTY)
89.3%
Customer demand per day
45 crates
Line capacity per day
34 crates
Bottleneck
Chain-of-Identity Barcode

Reading the bottleneck

The bottleneck is "Chain-of-Identity Barcode": it can process 34 crates per day against a demand of 45 crates, so it falls short of demand by 25.3%. Once downtime and scrap are counted, its cycle time grows from 1,284 s to 1,554 s, against a takt of 1,200 s. The largest loss at this step is equipment downtime (uptime 87%), about 192 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Cold-Chain & Temperature Logistics: Cold-Chain & Temperature Logistics