Global Clinical Trial Frozen Biopsy Courier Hub
Product family: Dry-Ice Bio-Specimen Air Hubs.
Flow: Hospital Investigator Sites → UN3373 Triple-Pack Audit → Customs Bio-Permit Clear → Automated Dry-Ice Top-Up → Chain-of-Custody Scan → Lab-Door Cryo Hand-Off → Central Bio-Analytical Labs
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. UN3373 Triple-Pack Audit | 90.0 s | 10 min | 96% | 98.8% | 168 | 294 (0.70 d) | 553 |
| 2. Customs Bio-Permit Clear | 138 s | 15 min | 87% | 95.0% | 210 | 588 (1.40 d) | 313 |
| 3. Automated Dry-Ice Top-Up | 98.0 s | 8 min | 94% | 98.4% | 126 | 504 (1.20 d) | 495 |
| 4. Chain-of-Custody Scan | 111 s | 8 min | 92% | 97.6% | 84 | 336 (0.80 d) | 417 |
| 5. Lab-Door Cryo Hand-Off | 75.0 s | 10 min | 96% | 99.1% | 105 | 210 (0.50 d) | 655 |
Key figures
- Takt time
- 129 s
- Lead time
- 5.31 d
- Value-added time
- 512 s
- Process cycle efficiency (PCE)
- 0.18%
- Rolled throughput yield (RTY)
- 89.3%
- Customer demand per day
- 420 samples
- Line capacity per day
- 313 samples
- Bottleneck
- Customs Bio-Permit Clear
Reading the bottleneck
The bottleneck is "Customs Bio-Permit Clear": it can process 313 samples per day against a demand of 420 samples, so it falls short of demand by 25.6%. Once downtime and scrap are counted, its cycle time grows from 138 s to 167 s, against a takt of 129 s. The largest loss at this step is equipment downtime (uptime 87%), about 20.6 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Cold-Chain & Temperature Logistics: Cold-Chain & Temperature Logistics
- Temperature-Controlled Cold Hub Distribution
- -80°C Ultra-Cold Gene Therapy Cryo Relay Hub
- Harbor Fresh Catch Icing & Air Export Cold Hub
- Pressurized Ethylene Banana Ripening Cold Rooms
- -25°C Automated Clad-Rack Deep-Freeze Hub
- 4°C Fresh Cut-Flower Vacuum Cool & Bouquet Hub
- National Blood Bank Platelets & FFP Cold Hub
- Chilled Ingredient Meal-Kit Recipe Assembly Hub
- Night-Shift +2°C Fresh Dairy Cross-Docking
- -28°C Direct-Store-Delivery Ice Cream Depot
- WHO PQS Solar Vaccine Cold-Chain Distribution