-25°C Automated Clad-Rack Deep-Freeze Hub
Product family: Full-Pallet Frozen Food Hub.
Flow: Frozen Bakery & Fries Plants → -25°C Conveyor Airlock Tunnel → 40m Stacker Crane Putaway → Robotic Layer-Picker Cell → Stretch-Wrap Freeze Film → Pre-Cooled Reefer Dock Seal → National Grocery DCs
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. -25°C Conveyor Airlock Tunnel | 25.8 s | 10 min | 96% | 98.8% | 880 | 1,540 (0.70 d) | 2,923 |
| 2. 40m Stacker Crane Putaway | 39.4 s | 15 min | 87% | 95.0% | 1,100 | 3,080 (1.40 d) | 1,661 |
| 3. Robotic Layer-Picker Cell | 28.0 s | 8 min | 94% | 98.4% | 660 | 2,640 (1.20 d) | 2,623 |
| 4. Stretch-Wrap Freeze Film | 31.7 s | 8 min | 92% | 97.6% | 440 | 1,760 (0.80 d) | 2,226 |
| 5. Pre-Cooled Reefer Dock Seal | 21.4 s | 10 min | 96% | 99.1% | 550 | 1,100 (0.50 d) | 3,494 |
Key figures
- Takt time
- 36.8 s
- Lead time
- 5.30 d
- Value-added time
- 146 s
- Process cycle efficiency (PCE)
- 0.034%
- Rolled throughput yield (RTY)
- 89.3%
- Customer demand per day
- 2,200 crates
- Line capacity per day
- 1,661 crates
- Bottleneck
- 40m Stacker Crane Putaway
Reading the bottleneck
The bottleneck is "40m Stacker Crane Putaway": it can process 1,661 crates per day against a demand of 2,200 crates, so it falls short of demand by 24.5%. Once downtime and scrap are counted, its cycle time grows from 39.4 s to 47.7 s, against a takt of 36.8 s. The largest loss at this step is equipment downtime (uptime 87%), about 5.9 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Cold-Chain & Temperature Logistics: Cold-Chain & Temperature Logistics
- Temperature-Controlled Cold Hub Distribution
- -80°C Ultra-Cold Gene Therapy Cryo Relay Hub
- Harbor Fresh Catch Icing & Air Export Cold Hub
- Pressurized Ethylene Banana Ripening Cold Rooms
- 4°C Fresh Cut-Flower Vacuum Cool & Bouquet Hub
- National Blood Bank Platelets & FFP Cold Hub
- Global Clinical Trial Frozen Biopsy Courier Hub
- Chilled Ingredient Meal-Kit Recipe Assembly Hub
- Night-Shift +2°C Fresh Dairy Cross-Docking
- -28°C Direct-Store-Delivery Ice Cream Depot
- WHO PQS Solar Vaccine Cold-Chain Distribution