Temperature-Controlled Cold Hub Distribution

Product family: Chilled Fresh & Biologics Crates.

Flow: Primary Food & Biotech Plants → Reefer Seal Dock Unload → Thermo Quarantine QC → FEFO Cryo Storage → Cryo Voice Picking → Gel-Pack & GPS Dispatch → Regional Stores & Pharmacies

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Temperature-Controlled Cold Hub DistributionSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Primary Food & Biotech Plants → Reefer Seal Dock Unload (42.0 s) → Thermo Quarantine QC (64.0 s) → FEFO Cryo Storage (46.0 s) → Cryo Voice Picking (52.0 s) → Gel-Pack & GPS Dispatch (34.8 s) → Regional Stores & Pharmacies.SUPPLIERPrimary Food &Biotech PlantsI0.70 d1Reefer Seal DockUnloadC/T 42.0 sI1.40 d2Thermo QuarantineQCC/T 64.0 sI1.20 d3FEFO Cryo StorageC/T 46.0 sI0.80 d4Cryo VoicePickingC/T 52.0 sI0.50 d5Gel-Pack & GPSDispatchC/T 34.8 sI0.70 dCUSTOMERRegional Stores& Pharmacies900 / crates

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Reefer Seal Dock Unload42.0 s10 min96%98.8%360630 (0.70 d)1,186
2. Thermo Quarantine QC64.0 s15 min87%95.0%4501,260 (1.40 d)674
3. FEFO Cryo Storage46.0 s8 min94%98.4%2701,080 (1.20 d)1,054
4. Cryo Voice Picking52.0 s8 min92%97.6%180720 (0.80 d)891
5. Gel-Pack & GPS Dispatch34.8 s10 min96%99.1%225450 (0.50 d)1,411

Key figures

Takt time
60.0 s
Lead time
5.30 d
Value-added time
239 s
Process cycle efficiency (PCE)
0.083%
Rolled throughput yield (RTY)
89.3%
Customer demand per day
900 crates
Line capacity per day
674 crates
Bottleneck
Thermo Quarantine QC

Reading the bottleneck

The bottleneck is "Thermo Quarantine QC": it can process 674 crates per day against a demand of 900 crates, so it falls short of demand by 25.1%. Once downtime and scrap are counted, its cycle time grows from 64.0 s to 77.4 s, against a takt of 60.0 s. The largest loss at this step is equipment downtime (uptime 87%), about 9.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Cold-Chain & Temperature Logistics: Cold-Chain & Temperature Logistics