-28°C Direct-Store-Delivery Ice Cream Depot

Product family: Impulse Street Cart Logistics.

Flow: Central Ice Cream Factory → -28°C Eutectic Plate Van Plug → Hand-Held Route Inventory Load → Voice Pick Impulse Cartons → POS Van-Sale Receipt Print → Evening Freezer Reconciliation → Beach Kiosks & Corner Shops

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: -28°C Direct-Store-Delivery Ice Cream DepotSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Central Ice Cream Factory → -28°C Eutectic Plate Van Plug (10.5 s) → Hand-Held Route Inventory Load (16.1 s) → Voice Pick Impulse Cartons (11.4 s) → POS Van-Sale Receipt Print (12.9 s) → Evening Freezer Reconciliation (8.7 s) → Beach Kiosks & Corner Shops.SUPPLIERCentral IceCream FactoryI0.70 d1-28°C EutecticPlate Van PlugC/T 10.5 sI1.40 d2Hand-Held RouteInventory LoadC/T 16.1 sI1.20 d3Voice PickImpulse CartonsC/T 11.4 sI0.80 d4POS Van-SaleReceipt PrintC/T 12.9 sI0.50 d5Evening FreezerReconciliationC/T 8.7 sI0.70 dCUSTOMERBeach Kiosks &Corner Shops1,800 / crates

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. -28°C Eutectic Plate Van Plug10.5 s10 min96%98.8%7201,260 (0.70 d)2,303
2. Hand-Held Route Inventory Load16.1 s15 min87%95.0%9002,520 (1.40 d)1,294
3. Voice Pick Impulse Cartons11.4 s8 min94%98.4%5402,160 (1.20 d)2,061
4. POS Van-Sale Receipt Print12.9 s8 min92%97.6%3601,440 (0.80 d)1,712
5. Evening Freezer Reconciliation8.7 s10 min96%99.1%450900 (0.50 d)2,690

Key figures

Takt time
15.0 s
Lead time
5.30 d
Value-added time
59.6 s
Process cycle efficiency (PCE)
0.042%
Rolled throughput yield (RTY)
89.3%
Customer demand per day
1,800 crates
Line capacity per day
1,294 crates
Bottleneck
Hand-Held Route Inventory Load

Reading the bottleneck

The bottleneck is "Hand-Held Route Inventory Load": it can process 1,294 crates per day against a demand of 1,800 crates, so it falls short of demand by 28.1%. Once downtime and scrap are counted, its cycle time grows from 16.1 s to 19.5 s, against a takt of 15.0 s. The largest loss at this step is equipment downtime (uptime 87%), about 2.4 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Cold-Chain & Temperature Logistics: Cold-Chain & Temperature Logistics