Chilled Ingredient Meal-Kit Recipe Assembly Hub

Product family: 4-Meal Weekly Recipe Boxes.

Flow: Local Farms & Portioners → Cold Prep Ingredient Portions → 3°C Insulated Line Picking → Foil Liner & Frozen Gel Pack → Box Seal & Zip Route Sort → Next-Day Morning Van → Weekly Home Subscribers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Chilled Ingredient Meal-Kit Recipe Assembly HubSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Local Farms & Portioners → Cold Prep Ingredient Portions (7.9 s) → 3°C Insulated Line Picking (12.0 s) → Foil Liner & Frozen Gel Pack (8.6 s) → Box Seal & Zip Route Sort (9.7 s) → Next-Day Morning Van (6.5 s) → Weekly Home Subscribers.SUPPLIERLocal Farms &PortionersI0.70 d1Cold PrepIngredient…C/T 7.9 sI1.40 d23°C InsulatedLine PickingC/T 12.0 sI1.20 d3Foil Liner &Frozen Gel PackC/T 8.6 sI0.80 d4Box Seal & ZipRoute SortC/T 9.7 sI0.50 d5Next-Day MorningVanC/T 6.5 sI0.70 dCUSTOMERWeekly HomeSubscribers4,800 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Cold Prep Ingredient Portions7.9 s10 min96%98.8%1,9203,360 (0.70 d)6,303
2. 3°C Insulated Line Picking12.0 s15 min87%95.0%2,4006,720 (1.40 d)3,595
3. Foil Liner & Frozen Gel Pack8.6 s8 min94%98.4%1,4405,760 (1.20 d)5,636
4. Box Seal & Zip Route Sort9.7 s8 min92%97.6%9603,840 (0.80 d)4,777
5. Next-Day Morning Van6.5 s10 min96%99.1%1,2002,400 (0.50 d)7,552

Key figures

Takt time
11.3 s
Lead time
5.30 d
Value-added time
44.7 s
Process cycle efficiency (PCE)
0.016%
Rolled throughput yield (RTY)
89.3%
Customer demand per day
4,800 packs
Line capacity per day
3,595 packs
Bottleneck
3°C Insulated Line Picking

Reading the bottleneck

The bottleneck is "3°C Insulated Line Picking": it can process 3,595 packs per day against a demand of 4,800 packs, so it falls short of demand by 25.1%. Once downtime and scrap are counted, its cycle time grows from 12.0 s to 14.5 s, against a takt of 11.3 s. The largest loss at this step is equipment downtime (uptime 87%), about 1.8 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.