Pneumatic Silo Truck Cement & Flour Tanker
Product family: Compressed-Air Blown Deliveries.
Flow: Flour Mill & Cement Silos → Allergen / Grade Wash Cert → Overhead Silo Gravity Load → Sealed Hatch Tag & Weight → Low-Pressure Pneumatic Blow → Clean Return & Moisture Check → Industrial Bakeries & Batching
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Allergen / Grade Wash Cert | 461 s | 10 min | 96% | 98.4% | 23 | 45 (0.60 d) | 107 |
| 2. Overhead Silo Gravity Load | 590 s | 12 min | 92% | 97.8% | 19 | 60 (0.80 d) | 78 |
| 3. Sealed Hatch Tag & Weight | 778 s | 15 min | 85% | 94.5% | 15 | 75 (1.00 d) | 51 |
| 4. Low-Pressure Pneumatic Blow | 518 s | 8 min | 94% | 97.4% | 15 | 45 (0.60 d) | 91 |
| 5. Clean Return & Moisture Check | 403 s | 5 min | 98% | 99.1% | 19 | 30 (0.40 d) | 127 |
Key figures
- Takt time
- 720 s
- Lead time
- 3.85 d
- Value-added time
- 2,750 s
- Process cycle efficiency (PCE)
- 1.3%
- Rolled throughput yield (RTY)
- 87.8%
- Customer demand per day
- 75 batches
- Line capacity per day
- 51 batches
- Bottleneck
- Sealed Hatch Tag & Weight
Reading the bottleneck
The bottleneck is "Sealed Hatch Tag & Weight": it can process 51 batches per day against a demand of 75 batches, so it falls short of demand by 31.9%. Once downtime and scrap are counted, its cycle time grows from 778 s to 969 s, against a takt of 720 s. The largest loss at this step is equipment downtime (uptime 85%), about 137 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of 3PL Milkruns, Last-Mile & Bulk Tankers: 3PL Milkruns, Last-Mile & Bulk Tankers
- Tier-2 Supplier JIT Automotive Milkrun Loop
- Zero-Emission Electric Urban Cargo Van Fleet
- Bottom-Loading Petrol Station Fuel Tanker Loop
- Intercity Night Swap-Body Linehaul Relay
- Food & Chemical ISO Tank Container Wash & Dispatch
- 24/7 Automated Outdoor Parcel Locker Network
- White-Glove Furniture & Gym In-Home Install
- Hospital Clean/Dirty Sterile Linen Fleet Loop
- Urban HORECA Cellar Drop & Empty Keg Pickup
- Crane-Equipped Timber & Brick Site Drop
- Industrial Scrap Skip Exchange & Weighbridge