Bottom-Loading Petrol Station Fuel Tanker Loop

Product family: 36,000L Multi-Grade Compartments.

Flow: Refinery Gantry Terminal → RFID Driver Gantry Clear → Bottom-Load Vapor Recovery → Metered Compartment Seal → Tank Drop Safety Check & Gauge → ATG Station Stock Reconcile → Retail Highway Service Sites

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Bottom-Loading Petrol Station Fuel Tanker LoopSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Refinery Gantry Terminal → RFID Driver Gantry Clear (540 s) → Bottom-Load Vapor Recovery (692 s) → Metered Compartment Seal (911 s) → Tank Drop Safety Check & Gauge (608 s) → ATG Station Stock Reconcile (473 s) → Retail Highway Service Sites.SUPPLIERRefinery GantryTerminalI0.59 d1RFID DriverGantry ClearC/T 540 sI0.80 d2Bottom-Load VaporRecoveryC/T 692 sI1.00 d3MeteredCompartment SealC/T 911 sI0.59 d4Tank Drop SafetyCheck & GaugeC/T 608 sI0.41 d5ATG Station StockReconcileC/T 473 sI0.41 dCUSTOMERRetail HighwayService Sites64 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. RFID Driver Gantry Clear540 s10 min96%98.4%1938 (0.59 d)91
2. Bottom-Load Vapor Recovery692 s12 min92%97.8%1651 (0.80 d)66
3. Metered Compartment Seal911 s15 min85%94.5%1364 (1.00 d)44
4. Tank Drop Safety Check & Gauge608 s8 min94%97.4%1338 (0.59 d)78
5. ATG Station Stock Reconcile473 s5 min98%99.1%1626 (0.41 d)108

Key figures

Takt time
844 s
Lead time
3.86 d
Value-added time
3,224 s
Process cycle efficiency (PCE)
1.5%
Rolled throughput yield (RTY)
87.8%
Customer demand per day
64 batches
Line capacity per day
44 batches
Bottleneck
Metered Compartment Seal

Reading the bottleneck

The bottleneck is "Metered Compartment Seal": it can process 44 batches per day against a demand of 64 batches, so it falls short of demand by 31.7%. Once downtime and scrap are counted, its cycle time grows from 911 s to 1,134 s, against a takt of 844 s. The largest loss at this step is equipment downtime (uptime 85%), about 161 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of 3PL Milkruns, Last-Mile & Bulk Tankers: 3PL Milkruns, Last-Mile & Bulk Tankers