Intercity Night Swap-Body Linehaul Relay

Product family: Double-Deck Trunking.

Flow: North Parcel Sorting Hubs → Yard Tractor Swap-Body Hook → Midpoint Highway Driver Meet → 5-Min Trailer/Body Exchange → GPS Geofence Arrival Trigger → Pre-Dawn Bay Unload Ready → South Regional Delivery DCs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Intercity Night Swap-Body Linehaul RelaySupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. North Parcel Sorting Hubs → Yard Tractor Swap-Body Hook (384 s) → Midpoint Highway Driver Meet (492 s) → 5-Min Trailer/Body Exchange (648 s) → GPS Geofence Arrival Trigger (432 s) → Pre-Dawn Bay Unload Ready (336 s) → South Regional Delivery DCs.SUPPLIERNorth ParcelSorting HubsI0.60 d1Yard TractorSwap-Body HookC/T 384 sI0.80 d2Midpoint HighwayDriver MeetC/T 492 sI1.00 d35-MinTrailer/Body…C/T 648 sI0.60 d4GPS GeofenceArrival TriggerC/T 432 sI0.40 d5Pre-Dawn BayUnload ReadyC/T 336 sI0.40 dCUSTOMERSouth RegionalDelivery DCs90 / TEU

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Yard Tractor Swap-Body Hook384 s10 min96%98.4%2754 (0.60 d)128
2. Midpoint Highway Driver Meet492 s12 min92%97.8%2372 (0.80 d)94
3. 5-Min Trailer/Body Exchange648 s15 min85%94.5%1890 (1.00 d)61
4. GPS Geofence Arrival Trigger432 s8 min94%97.4%1854 (0.60 d)109
5. Pre-Dawn Bay Unload Ready336 s5 min98%99.1%2336 (0.40 d)153

Key figures

Takt time
600 s
Lead time
3.84 d
Value-added time
2,292 s
Process cycle efficiency (PCE)
1.1%
Rolled throughput yield (RTY)
87.8%
Customer demand per day
90 TEU
Line capacity per day
61 TEU
Bottleneck
5-Min Trailer/Body Exchange

Reading the bottleneck

The bottleneck is "5-Min Trailer/Body Exchange": it can process 61 TEU per day against a demand of 90 TEU, so it falls short of demand by 31.8%. Once downtime and scrap are counted, its cycle time grows from 648 s to 807 s, against a takt of 600 s. The largest loss at this step is equipment downtime (uptime 85%), about 114 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.