Urban HORECA Cellar Drop & Empty Keg Pickup
Product family: City Bar & Pub Supply Loops.
Flow: Regional Beverage Depots → Overnight Route Pick by Cellar → Tail-Lift & Electric Stair Climb → Cellar Chiller Rotation FEFO → Empty Kegs & Glass Scan Back → Deposit Credit App Settlement → Bars, Cafes & Restaurants
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Overnight Route Pick by Cellar | 25.4 s | 10 min | 96% | 98.4% | 204 | 408 (0.60 d) | 930 |
| 2. Tail-Lift & Electric Stair Climb | 32.6 s | 12 min | 92% | 97.8% | 170 | 544 (0.80 d) | 666 |
| 3. Cellar Chiller Rotation FEFO | 43.0 s | 15 min | 85% | 94.5% | 136 | 680 (1.00 d) | 420 |
| 4. Empty Kegs & Glass Scan Back | 28.6 s | 8 min | 94% | 97.4% | 136 | 408 (0.60 d) | 788 |
| 5. Deposit Credit App Settlement | 22.2 s | 5 min | 98% | 99.1% | 170 | 272 (0.40 d) | 1,129 |
Key figures
- Takt time
- 39.7 s
- Lead time
- 3.81 d
- Value-added time
- 152 s
- Process cycle efficiency (PCE)
- 0.15%
- Rolled throughput yield (RTY)
- 87.8%
- Customer demand per day
- 680 units
- Line capacity per day
- 420 units
- Bottleneck
- Cellar Chiller Rotation FEFO
Reading the bottleneck
The bottleneck is "Cellar Chiller Rotation FEFO": it can process 420 units per day against a demand of 680 units, so it falls short of demand by 38.2%. Once downtime and scrap are counted, its cycle time grows from 43.0 s to 53.5 s, against a takt of 39.7 s. The largest loss at this step is equipment downtime (uptime 85%), about 7.6 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of 3PL Milkruns, Last-Mile & Bulk Tankers: 3PL Milkruns, Last-Mile & Bulk Tankers
- Tier-2 Supplier JIT Automotive Milkrun Loop
- Zero-Emission Electric Urban Cargo Van Fleet
- Bottom-Loading Petrol Station Fuel Tanker Loop
- Intercity Night Swap-Body Linehaul Relay
- Food & Chemical ISO Tank Container Wash & Dispatch
- 24/7 Automated Outdoor Parcel Locker Network
- White-Glove Furniture & Gym In-Home Install
- Hospital Clean/Dirty Sterile Linen Fleet Loop
- Crane-Equipped Timber & Brick Site Drop
- Industrial Scrap Skip Exchange & Weighbridge
- Pneumatic Silo Truck Cement & Flour Tanker