Crane-Equipped Timber & Brick Site Drop

Product family: Off-Road Site Tele-Crane Fleet.

Flow: Builders Merchant Yards → Yard Forklift Sequence Load → Site Road Access & Outrigger → Hydra-Crane Lift Over Fence → Subcontractor Foreman e-POD → Empty EPAL Return Collect → Active Building Sites

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Crane-Equipped Timber & Brick Site DropSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Builders Merchant Yards → Yard Forklift Sequence Load (203 s) → Site Road Access & Outrigger (260 s) → Hydra-Crane Lift Over Fence (343 s) → Subcontractor Foreman e-POD (229 s) → Empty EPAL Return Collect (178 s) → Active Building Sites.SUPPLIERBuildersMerchant YardsI0.60 d1Yard ForkliftSequence LoadC/T 203 sI0.80 d2Site Road Access& OutriggerC/T 260 sI1.00 d3Hydra-Crane LiftOver FenceC/T 343 sI0.60 d4SubcontractorForeman e-PODC/T 229 sI0.40 d5Empty EPAL ReturnCollectC/T 178 sI0.40 dCUSTOMERActive BuildingSites85 / orders

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Yard Forklift Sequence Load203 s10 min96%98.4%2651 (0.60 d)117
2. Site Road Access & Outrigger260 s12 min92%97.8%2168 (0.80 d)83
3. Hydra-Crane Lift Over Fence343 s15 min85%94.5%1785 (1.00 d)53
4. Subcontractor Foreman e-POD229 s8 min94%97.4%1751 (0.60 d)98
5. Empty EPAL Return Collect178 s5 min98%99.1%2134 (0.40 d)141

Key figures

Takt time
318 s
Lead time
3.84 d
Value-added time
1,213 s
Process cycle efficiency (PCE)
1.2%
Rolled throughput yield (RTY)
87.8%
Customer demand per day
85 orders
Line capacity per day
53 orders
Bottleneck
Hydra-Crane Lift Over Fence

Reading the bottleneck

The bottleneck is "Hydra-Crane Lift Over Fence": it can process 53 orders per day against a demand of 85 orders, so it falls short of demand by 38.0%. Once downtime and scrap are counted, its cycle time grows from 343 s to 427 s, against a takt of 318 s. The largest loss at this step is equipment downtime (uptime 85%), about 60.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of 3PL Milkruns, Last-Mile & Bulk Tankers: 3PL Milkruns, Last-Mile & Bulk Tankers