24/7 Automated Outdoor Parcel Locker Network
Product family: Single-Stop 60-Parcel Drops.
Flow: Regional Courier Hub → Zone Locker Grouping Scan → Multi-Compartment Van Load → Bulk Locker Open-Door Fill → Instant SMS PIN Notification → Unclaimed 72h Retrieval → Self-Serve Locker Consumers
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Zone Locker Grouping Scan | 6.2 s | 10 min | 96% | 98.4% | 840 | 1,680 (0.60 d) | 3,809 |
| 2. Multi-Compartment Van Load | 7.9 s | 12 min | 92% | 97.8% | 700 | 2,240 (0.80 d) | 2,747 |
| 3. Bulk Locker Open-Door Fill | 10.4 s | 15 min | 85% | 94.5% | 560 | 2,800 (1.00 d) | 1,738 |
| 4. Instant SMS PIN Notification | 6.9 s | 8 min | 94% | 97.4% | 560 | 1,680 (0.60 d) | 3,264 |
| 5. Unclaimed 72h Retrieval | 5.4 s | 5 min | 98% | 99.1% | 700 | 1,120 (0.40 d) | 4,640 |
Key figures
- Takt time
- 9.6 s
- Lead time
- 3.80 d
- Value-added time
- 36.8 s
- Process cycle efficiency (PCE)
- 0.036%
- Rolled throughput yield (RTY)
- 87.8%
- Customer demand per day
- 2,800 orders
- Line capacity per day
- 1,738 orders
- Bottleneck
- Bulk Locker Open-Door Fill
Reading the bottleneck
The bottleneck is "Bulk Locker Open-Door Fill": it can process 1,738 orders per day against a demand of 2,800 orders, so it falls short of demand by 37.9%. Once downtime and scrap are counted, its cycle time grows from 10.4 s to 12.9 s, against a takt of 9.6 s. The largest loss at this step is equipment downtime (uptime 85%), about 1.8 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of 3PL Milkruns, Last-Mile & Bulk Tankers: 3PL Milkruns, Last-Mile & Bulk Tankers
- Tier-2 Supplier JIT Automotive Milkrun Loop
- Zero-Emission Electric Urban Cargo Van Fleet
- Bottom-Loading Petrol Station Fuel Tanker Loop
- Intercity Night Swap-Body Linehaul Relay
- Food & Chemical ISO Tank Container Wash & Dispatch
- White-Glove Furniture & Gym In-Home Install
- Hospital Clean/Dirty Sterile Linen Fleet Loop
- Urban HORECA Cellar Drop & Empty Keg Pickup
- Crane-Equipped Timber & Brick Site Drop
- Industrial Scrap Skip Exchange & Weighbridge
- Pneumatic Silo Truck Cement & Flour Tanker