Zero-Emission Electric Urban Cargo Van Fleet
Product family: Inner-City Clean-Air Parcels.
Flow: Peri-Urban Micro-Hubs → Overnight Depot DC Fast Charge → Cart Roll-On Sequence Load → Dynamic Traffic App Delivery → Neighbor / Locker Fallback → Return Scan & Evening Plug-In → City-Center Residents
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Overnight Depot DC Fast Charge | 12.3 s | 10 min | 96% | 98.4% | 420 | 840 (0.60 d) | 1,920 |
| 2. Cart Roll-On Sequence Load | 15.8 s | 12 min | 92% | 97.8% | 350 | 1,120 (0.80 d) | 1,374 |
| 3. Dynamic Traffic App Delivery | 20.8 s | 15 min | 85% | 94.5% | 280 | 1,400 (1.00 d) | 869 |
| 4. Neighbor / Locker Fallback | 13.9 s | 8 min | 94% | 97.4% | 280 | 840 (0.60 d) | 1,620 |
| 5. Return Scan & Evening Plug-In | 10.8 s | 5 min | 98% | 99.1% | 350 | 560 (0.40 d) | 2,320 |
Key figures
- Takt time
- 19.3 s
- Lead time
- 3.80 d
- Value-added time
- 73.6 s
- Process cycle efficiency (PCE)
- 0.072%
- Rolled throughput yield (RTY)
- 87.8%
- Customer demand per day
- 1,400 orders
- Line capacity per day
- 869 orders
- Bottleneck
- Dynamic Traffic App Delivery
Reading the bottleneck
The bottleneck is "Dynamic Traffic App Delivery": it can process 869 orders per day against a demand of 1,400 orders, so it falls short of demand by 37.9%. Once downtime and scrap are counted, its cycle time grows from 20.8 s to 25.9 s, against a takt of 19.3 s. The largest loss at this step is equipment downtime (uptime 85%), about 3.7 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of 3PL Milkruns, Last-Mile & Bulk Tankers: 3PL Milkruns, Last-Mile & Bulk Tankers
- Tier-2 Supplier JIT Automotive Milkrun Loop
- Bottom-Loading Petrol Station Fuel Tanker Loop
- Intercity Night Swap-Body Linehaul Relay
- Food & Chemical ISO Tank Container Wash & Dispatch
- 24/7 Automated Outdoor Parcel Locker Network
- White-Glove Furniture & Gym In-Home Install
- Hospital Clean/Dirty Sterile Linen Fleet Loop
- Urban HORECA Cellar Drop & Empty Keg Pickup
- Crane-Equipped Timber & Brick Site Drop
- Industrial Scrap Skip Exchange & Weighbridge
- Pneumatic Silo Truck Cement & Flour Tanker