Tier-2 Supplier JIT Automotive Milkrun Loop
Product family: Returnable KLT Bin Routes.
Flow: 15 Regional Auto Tier-2s → Empty KLT Staging & Dispatch → Timed 4-Stop Milkrun Collect → Cross-Dock Line-Side Sort → RFID Bin Scan vs Kanban → Shuttle Unload at OEM Bay → OEM Body & Powertrain Shop
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Empty KLT Staging & Dispatch | 288 s | 10 min | 96% | 98.4% | 36 | 72 (0.60 d) | 171 |
| 2. Timed 4-Stop Milkrun Collect | 369 s | 12 min | 92% | 97.8% | 30 | 96 (0.80 d) | 125 |
| 3. Cross-Dock Line-Side Sort | 486 s | 15 min | 85% | 94.5% | 24 | 120 (1.00 d) | 82 |
| 4. RFID Bin Scan vs Kanban | 324 s | 8 min | 94% | 97.4% | 24 | 72 (0.60 d) | 146 |
| 5. Shuttle Unload at OEM Bay | 252 s | 5 min | 98% | 99.1% | 30 | 48 (0.40 d) | 203 |
Key figures
- Takt time
- 450 s
- Lead time
- 3.83 d
- Value-added time
- 1,719 s
- Process cycle efficiency (PCE)
- 0.83%
- Rolled throughput yield (RTY)
- 87.8%
- Customer demand per day
- 120 crates
- Line capacity per day
- 82 crates
- Bottleneck
- Cross-Dock Line-Side Sort
Reading the bottleneck
The bottleneck is "Cross-Dock Line-Side Sort": it can process 82 crates per day against a demand of 120 crates, so it falls short of demand by 31.8%. Once downtime and scrap are counted, its cycle time grows from 486 s to 605 s, against a takt of 450 s. The largest loss at this step is equipment downtime (uptime 85%), about 85.8 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of 3PL Milkruns, Last-Mile & Bulk Tankers: 3PL Milkruns, Last-Mile & Bulk Tankers
- Zero-Emission Electric Urban Cargo Van Fleet
- Bottom-Loading Petrol Station Fuel Tanker Loop
- Intercity Night Swap-Body Linehaul Relay
- Food & Chemical ISO Tank Container Wash & Dispatch
- 24/7 Automated Outdoor Parcel Locker Network
- White-Glove Furniture & Gym In-Home Install
- Hospital Clean/Dirty Sterile Linen Fleet Loop
- Urban HORECA Cellar Drop & Empty Keg Pickup
- Crane-Equipped Timber & Brick Site Drop
- Industrial Scrap Skip Exchange & Weighbridge
- Pneumatic Silo Truck Cement & Flour Tanker