White-Glove Furniture & Gym In-Home Install

Product family: Assemble-and-Remove Packaging.

Flow: Furniture Regional Hubs → Route Sequence Pad-Wrap Load → Pre-Arrival 30-Min SMS Alert → Carry-In, Assembly & Leveling → Packaging Foam Backhaul Collect → Photo Sign-Off CSAT Survey → Home & Office Buyers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: White-Glove Furniture & Gym In-Home InstallSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Furniture Regional Hubs → Route Sequence Pad-Wrap Load (123 s) → Pre-Arrival 30-Min SMS Alert (158 s) → Carry-In, Assembly & Leveling (208 s) → Packaging Foam Backhaul Collect (139 s) → Photo Sign-Off CSAT Survey (108 s) → Home & Office Buyers.SUPPLIERFurnitureRegional HubsI0.60 d1Route SequencePad-Wrap LoadC/T 123 sI0.80 d2Pre-Arrival30-Min SMS AlertC/T 158 sI1.00 d3Carry-In,Assembly &…C/T 208 sI0.60 d4Packaging FoamBackhaul CollectC/T 139 sI0.40 d5Photo Sign-OffCSAT SurveyC/T 108 sI0.40 dCUSTOMERHome & OfficeBuyers140 / orders

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Route Sequence Pad-Wrap Load123 s10 min96%98.4%4284 (0.60 d)192
2. Pre-Arrival 30-Min SMS Alert158 s12 min92%97.8%35112 (0.80 d)137
3. Carry-In, Assembly & Leveling208 s15 min85%94.5%28140 (1.00 d)87
4. Packaging Foam Backhaul Collect139 s8 min94%97.4%2884 (0.60 d)162
5. Photo Sign-Off CSAT Survey108 s5 min98%99.1%3556 (0.40 d)232

Key figures

Takt time
193 s
Lead time
3.83 d
Value-added time
736 s
Process cycle efficiency (PCE)
0.71%
Rolled throughput yield (RTY)
87.8%
Customer demand per day
140 orders
Line capacity per day
87 orders
Bottleneck
Carry-In, Assembly & Leveling

Reading the bottleneck

The bottleneck is "Carry-In, Assembly & Leveling": it can process 87 orders per day against a demand of 140 orders, so it falls short of demand by 37.9%. Once downtime and scrap are counted, its cycle time grows from 208 s to 259 s, against a takt of 193 s. The largest loss at this step is equipment downtime (uptime 85%), about 36.7 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of 3PL Milkruns, Last-Mile & Bulk Tankers: 3PL Milkruns, Last-Mile & Bulk Tankers