Hospital Clean/Dirty Sterile Linen Fleet Loop

Product family: Barrier-Truck Textile Service.

Flow: Central Hospital Laundry → Sealed Clean Barrier Truck Load → Ward Closet Par Replenishment → Bio-Soiled Bag Cage Collect → Post-Drop Disinfection Wash → RFID Linen Cycle Count → 18 Regional Hospitals

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Hospital Clean/Dirty Sterile Linen Fleet LoopSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Central Hospital Laundry → Sealed Clean Barrier Truck Load (19.2 s) → Ward Closet Par Replenishment (24.6 s) → Bio-Soiled Bag Cage Collect (32.4 s) → Post-Drop Disinfection Wash (21.6 s) → RFID Linen Cycle Count (16.8 s) → 18 Regional Hospitals.SUPPLIERCentralHospitalLaundryI0.60 d1Sealed CleanBarrier Truck…C/T 19.2 sI0.80 d2Ward Closet ParReplenishmentC/T 24.6 sI1.00 d3Bio-Soiled BagCage CollectC/T 32.4 sI0.60 d4Post-DropDisinfection WashC/T 21.6 sI0.40 d5RFID Linen CycleCountC/T 16.8 sI0.40 dCUSTOMER18 RegionalHospitals1,800 / crates

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Sealed Clean Barrier Truck Load19.2 s10 min96%98.4%5401,080 (0.60 d)2,558
2. Ward Closet Par Replenishment24.6 s12 min92%97.8%4501,440 (0.80 d)1,870
3. Bio-Soiled Bag Cage Collect32.4 s15 min85%94.5%3601,800 (1.00 d)1,227
4. Post-Drop Disinfection Wash21.6 s8 min94%97.4%3601,080 (0.60 d)2,187
5. RFID Linen Cycle Count16.8 s5 min98%99.1%450720 (0.40 d)3,052

Key figures

Takt time
30.0 s
Lead time
3.80 d
Value-added time
115 s
Process cycle efficiency (PCE)
0.056%
Rolled throughput yield (RTY)
87.8%
Customer demand per day
1,800 crates
Line capacity per day
1,227 crates
Bottleneck
Bio-Soiled Bag Cage Collect

Reading the bottleneck

The bottleneck is "Bio-Soiled Bag Cage Collect": it can process 1,227 crates per day against a demand of 1,800 crates, so it falls short of demand by 31.8%. Once downtime and scrap are counted, its cycle time grows from 32.4 s to 40.3 s, against a takt of 30.0 s. The largest loss at this step is equipment downtime (uptime 85%), about 5.7 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.