Industrial Scrap Skip Exchange & Weighbridge

Product family: Compactor Roll-Off Routes.

Flow: Manufacturing Plant Yards → IoT Fill-Sensor Dispatch → Empty Skip Drop & Tarping → Plant Weighbridge Gross Weight → Tipping Bay Material Grade → Circular Credit Note Issue → MRF & Steel Foundry Mills

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Industrial Scrap Skip Exchange & WeighbridgeSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Manufacturing Plant Yards → IoT Fill-Sensor Dispatch (314 s) → Empty Skip Drop & Tarping (403 s) → Plant Weighbridge Gross Weight (530 s) → Tipping Bay Material Grade (353 s) → Circular Credit Note Issue (275 s) → MRF & Steel Foundry Mills.SUPPLIERManufacturingPlant YardsI0.60 d1IoT Fill-SensorDispatchC/T 314 sI0.80 d2Empty Skip Drop &TarpingC/T 403 sI1.00 d3Plant WeighbridgeGross WeightC/T 530 sI0.60 d4Tipping BayMaterial GradeC/T 353 sI0.40 d5Circular CreditNote IssueC/T 275 sI0.40 dCUSTOMERMRF & SteelFoundry Mills110 / TEU

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. IoT Fill-Sensor Dispatch314 s10 min96%98.4%3366 (0.60 d)156
2. Empty Skip Drop & Tarping403 s12 min92%97.8%2888 (0.80 d)114
3. Plant Weighbridge Gross Weight530 s15 min85%94.5%22110 (1.00 d)75
4. Tipping Bay Material Grade353 s8 min94%97.4%2266 (0.60 d)134
5. Circular Credit Note Issue275 s5 min98%99.1%2844 (0.40 d)187

Key figures

Takt time
491 s
Lead time
3.83 d
Value-added time
1,875 s
Process cycle efficiency (PCE)
0.91%
Rolled throughput yield (RTY)
87.8%
Customer demand per day
110 TEU
Line capacity per day
75 TEU
Bottleneck
Plant Weighbridge Gross Weight

Reading the bottleneck

The bottleneck is "Plant Weighbridge Gross Weight": it can process 75 TEU per day against a demand of 110 TEU, so it falls short of demand by 31.8%. Once downtime and scrap are counted, its cycle time grows from 530 s to 660 s, against a takt of 491 s. The largest loss at this step is equipment downtime (uptime 85%), about 93.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.