Food & Chemical ISO Tank Container Wash & Dispatch

Product family: 26,000L Kosher/ADR Tanks.

Flow: Chemical Fleet Operators → Heel Drain & SDS Verification → Rotary 80-Bar Steam Spinner → Food/Kosher ATP Swab & Cert → Air-Dry & Valve Gasket Replace → Sealing Tag & Dispatch Ready → Chemical Export Loaders

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Food & Chemical ISO Tank Container Wash & DispatchSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Chemical Fleet Operators → Heel Drain & SDS Verification (823 s) → Rotary 80-Bar Steam Spinner (1,054 s) → Food/Kosher ATP Swab & Cert (1,389 s) → Air-Dry & Valve Gasket Replace (926 s) → Sealing Tag & Dispatch Ready (720 s) → Chemical Export Loaders.SUPPLIERChemical FleetOperatorsI0.60 d1Heel Drain & SDSVerificationC/T 823 sI0.81 d2Rotary 80-BarSteam SpinnerC/T 1,054 sI1.00 d3Food/Kosher ATPSwab & CertC/T 1,389 sI0.60 d4Air-Dry & ValveGasket ReplaceC/T 926 sI0.40 d5Sealing Tag &Dispatch ReadyC/T 720 sI0.40 dCUSTOMERChemical ExportLoaders42 / TEU

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Heel Drain & SDS Verification823 s10 min96%98.4%1325 (0.60 d)60
2. Rotary 80-Bar Steam Spinner1,054 s12 min92%97.8%1134 (0.81 d)44
3. Food/Kosher ATP Swab & Cert1,389 s15 min85%94.5%842 (1.00 d)28
4. Air-Dry & Valve Gasket Replace926 s8 min94%97.4%825 (0.60 d)51
5. Sealing Tag & Dispatch Ready720 s5 min98%99.1%1117 (0.40 d)71

Key figures

Takt time
1,286 s
Lead time
3.90 d
Value-added time
4,912 s
Process cycle efficiency (PCE)
2.3%
Rolled throughput yield (RTY)
87.8%
Customer demand per day
42 TEU
Line capacity per day
28 TEU
Bottleneck
Food/Kosher ATP Swab & Cert

Reading the bottleneck

The bottleneck is "Food/Kosher ATP Swab & Cert": it can process 28 TEU per day against a demand of 42 TEU, so it falls short of demand by 32.2%. Once downtime and scrap are counted, its cycle time grows from 1,389 s to 1,729 s, against a takt of 1,286 s. The largest loss at this step is equipment downtime (uptime 85%), about 245 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of 3PL Milkruns, Last-Mile & Bulk Tankers: 3PL Milkruns, Last-Mile & Bulk Tankers