Steerable Braided 8F Electrophysiology Catheter

Product family: RF Ablation Heart Catheters.

Flow: Polyamide Elastomer Resins & Platinum PtIr → 16-Carrier PTFE Liner Braid → Multi-Durometer Elastomer Reflow → PtIr Ring Swage & Micro-Solder → Distal Tip Deflection & Leak → Long-Tray Sterile Pouch & EtO Release → EP Cardiac Catheter Labs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Steerable Braided 8F Electrophysiology CatheterSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Polyamide Elastomer Resins & Platinum PtIr → 16-Carrier PTFE Liner Braid (82.0 s) → Multi-Durometer Elastomer Reflow (92.0 s) → PtIr Ring Swage & Micro-Solder (127 s) → Distal Tip Deflection & Leak (85.0 s) → Long-Tray Sterile Pouch & EtO Release (96.0 s) → EP Cardiac Catheter Labs.SUPPLIERPolyamideElastomerResins &…I1.70 d116-Carrier PTFELiner BraidC/T 82.0 sI1.50 d2Multi-DurometerElastomer ReflowC/T 92.0 sI1.90 d3PtIr Ring Swage &Micro-SolderC/T 127 sI1.00 d4Distal TipDeflection & LeakC/T 85.0 sI2.40 d5Long-Tray SterilePouch & EtO…C/T 96.0 sI2.00 dCUSTOMEREP CardiacCatheter Labs460 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 16-Carrier PTFE Liner Braid82.0 s30 min94%98.5%460782 (1.70 d)589
2. Multi-Durometer Elastomer Reflow92.0 s25 min92%97.8%368690 (1.50 d)510
3. PtIr Ring Swage & Micro-Solder127 s20 min86%94.8%230874 (1.90 d)331
4. Distal Tip Deflection & Leak85.0 s12 min95%98.9%184460 (1.00 d)577
5. Long-Tray Sterile Pouch & EtO Release96.0 s15 min92%98.4%6901,104 (2.40 d)504

Key figures

Takt time
117 s
Lead time
10.5 d
Value-added time
482 s
Process cycle efficiency (PCE)
0.085%
Rolled throughput yield (RTY)
88.9%
Customer demand per day
460 units
Line capacity per day
331 units
Bottleneck
PtIr Ring Swage & Micro-Solder

Reading the bottleneck

The bottleneck is "PtIr Ring Swage & Micro-Solder": it can process 331 units per day against a demand of 460 units, so it falls short of demand by 28.0%. Once downtime and scrap are counted, its cycle time grows from 127 s to 156 s, against a takt of 117 s. The largest loss at this step is equipment downtime (uptime 86%), about 20.7 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.