CoCr Laser-Cut Drug-Eluting Coronary Stent

Product family: Sirolimus-Eluting Micro-Stents.

Flow: L605 Cobalt-Chromium Tube → Femtosecond Fiber Laser Cut → Descaling & Acid Electropolish → Ultrasonic Drug Polymer Spray → Balloon Catheter Thermal Weld → Sterile Pouch & EtO Release → Interventional Cardiology

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: CoCr Laser-Cut Drug-Eluting Coronary StentSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. L605 Cobalt-Chromium Tube → Femtosecond Fiber Laser Cut (58.0 s) → Descaling & Acid Electropolish (65.0 s) → Ultrasonic Drug Polymer Spray (90.0 s) → Balloon Catheter Thermal Weld (60.0 s) → Sterile Pouch & EtO Release (68.0 s) → Interventional Cardiology.SUPPLIERL605Cobalt-ChromiumTubeI1.70 d1Femtosecond FiberLaser CutC/T 58.0 sI1.50 d2Descaling & AcidElectropolishC/T 65.0 sI1.90 d3Ultrasonic DrugPolymer SprayC/T 90.0 sI1.00 d4Balloon CatheterThermal WeldC/T 60.0 sI2.40 d5Sterile Pouch &EtO ReleaseC/T 68.0 sI2.00 dCUSTOMERInterventionalCardiology650 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Femtosecond Fiber Laser Cut58.0 s30 min94%98.5%6501,105 (1.70 d)833
2. Descaling & Acid Electropolish65.0 s25 min92%97.8%520975 (1.50 d)722
3. Ultrasonic Drug Polymer Spray90.0 s20 min86%94.8%3251,235 (1.90 d)467
4. Balloon Catheter Thermal Weld60.0 s12 min95%98.9%260650 (1.00 d)817
5. Sterile Pouch & EtO Release68.0 s15 min92%98.4%9751,560 (2.40 d)711

Key figures

Takt time
83.1 s
Lead time
10.5 d
Value-added time
341 s
Process cycle efficiency (PCE)
0.060%
Rolled throughput yield (RTY)
88.9%
Customer demand per day
650 units
Line capacity per day
467 units
Bottleneck
Ultrasonic Drug Polymer Spray

Reading the bottleneck

The bottleneck is "Ultrasonic Drug Polymer Spray": it can process 467 units per day against a demand of 650 units, so it falls short of demand by 28.1%. Once downtime and scrap are counted, its cycle time grows from 90.0 s to 110 s, against a takt of 83.1 s. The largest loss at this step is equipment downtime (uptime 86%), about 14.7 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.