Hermetic MRI-Safe Cardiac Pacemaker Can

Product family: 12-Year Li-CFx Titanium Can.

Flow: Medical Battery & Titanium Suppliers → Micro-Hybrid Board Reflow → Li-CFx Cell & Ti Case Insert → Nd:YAG Laser Hermetic Seam → Helium Mass-Spec 1e-9 Leak → Thermal Soak & Programmer Check → Cardiac Electrophysiology

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Hermetic MRI-Safe Cardiac Pacemaker CanSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Medical Battery & Titanium Suppliers → Micro-Hybrid Board Reflow (90.0 s) → Li-CFx Cell & Ti Case Insert (100 s) → Nd:YAG Laser Hermetic Seam (139 s) → Helium Mass-Spec 1e-9 Leak (93.0 s) → Thermal Soak & Programmer Check (105 s) → Cardiac Electrophysiology.SUPPLIERMedical Battery& TitaniumSuppliersI1.70 d1Micro-HybridBoard ReflowC/T 90.0 sI1.50 d2Li-CFx Cell & TiCase InsertC/T 100 sI1.90 d3Nd:YAG LaserHermetic SeamC/T 139 sI1.00 d4Helium Mass-Spec1e-9 LeakC/T 93.0 sI2.40 d5Thermal Soak &Programmer CheckC/T 105 sI2.00 dCUSTOMERCardiacElectrophysiology420 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Micro-Hybrid Board Reflow90.0 s30 min94%98.5%420714 (1.70 d)537
2. Li-CFx Cell & Ti Case Insert100 s25 min92%97.8%336630 (1.50 d)469
3. Nd:YAG Laser Hermetic Seam139 s20 min86%94.8%210798 (1.90 d)303
4. Helium Mass-Spec 1e-9 Leak93.0 s12 min95%98.9%168420 (1.00 d)527
5. Thermal Soak & Programmer Check105 s15 min92%98.4%6301,008 (2.40 d)460

Key figures

Takt time
129 s
Lead time
10.5 d
Value-added time
527 s
Process cycle efficiency (PCE)
0.093%
Rolled throughput yield (RTY)
88.9%
Customer demand per day
420 units
Line capacity per day
303 units
Bottleneck
Nd:YAG Laser Hermetic Seam

Reading the bottleneck

The bottleneck is "Nd:YAG Laser Hermetic Seam": it can process 303 units per day against a demand of 420 units, so it falls short of demand by 27.9%. Once downtime and scrap are counted, its cycle time grows from 139 s to 170 s, against a takt of 129 s. The largest loss at this step is equipment downtime (uptime 86%), about 22.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Implantable & Surgical MedTech: Implantable & Surgical MedTech