16-Channel Flexible 3T MRI RF Receiver Coil

Product family: Lightweight Clinical Array Coils.

Flow: Laminate & Non-Magnetic Capacitor Suppliers → Etched Copper Loop Element → Non-Magnetic Capacitor Tune → Low-Noise Preamp Snaps → Flame-Retardant Foam Sew/Weld → 3T Network Analyzer S11 Test → MRI OEM Factories

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 16-Channel Flexible 3T MRI RF Receiver CoilSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Laminate & Non-Magnetic Capacitor Suppliers → Etched Copper Loop Element (420 s) → Non-Magnetic Capacitor Tune (468 s) → Low-Noise Preamp Snaps (648 s) → Flame-Retardant Foam Sew/Weld (432 s) → 3T Network Analyzer S11 Test (492 s) → MRI OEM Factories.SUPPLIERLaminate &Non-MagneticCapacitor…I1.71 d1Etched CopperLoop ElementC/T 420 sI1.51 d2Non-MagneticCapacitor TuneC/T 468 sI1.91 d3Low-Noise PreampSnapsC/T 648 sI1.00 d4Flame-RetardantFoam Sew/WeldC/T 432 sI2.40 d53T NetworkAnalyzer S11 TestC/T 492 sI2.00 dCUSTOMERMRI OEMFactories45 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Etched Copper Loop Element420 s30 min94%98.5%4577 (1.71 d)56
2. Non-Magnetic Capacitor Tune468 s25 min92%97.8%3668 (1.51 d)48
3. Low-Noise Preamp Snaps648 s20 min86%94.8%2386 (1.91 d)31
4. Flame-Retardant Foam Sew/Weld432 s12 min95%98.9%1845 (1.00 d)55
5. 3T Network Analyzer S11 Test492 s15 min92%98.4%68108 (2.40 d)49

Key figures

Takt time
600 s
Lead time
10.6 d
Value-added time
2,460 s
Process cycle efficiency (PCE)
0.86%
Rolled throughput yield (RTY)
88.9%
Customer demand per day
45 units
Line capacity per day
31 units
Bottleneck
Low-Noise Preamp Snaps

Reading the bottleneck

The bottleneck is "Low-Noise Preamp Snaps": it can process 31 units per day against a demand of 45 units, so it falls short of demand by 31.1%. Once downtime and scrap are counted, its cycle time grows from 648 s to 795 s, against a takt of 600 s. The largest loss at this step is equipment downtime (uptime 86%), about 105 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.