Porous 3D-Printed Titanium Hip Acetabular Cup

Product family: Cementless Orthopedic Cups.

Flow: Ti-6Al-4V ELI Medical Powder → EBM Porous Trabecular Melt → 5-Axis Inner Taper Finish CNC → Hydroxylapatite Plasma Coat → Cleanroom Ultrasonic Passiv → Double Blister & Gamma Sterile → Orthopedic Hospital Kits

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Porous 3D-Printed Titanium Hip Acetabular CupSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Ti-6Al-4V ELI Medical Powder → EBM Porous Trabecular Melt (158 s) → 5-Axis Inner Taper Finish CNC (176 s) → Hydroxylapatite Plasma Coat (243 s) → Cleanroom Ultrasonic Passiv (162 s) → Double Blister & Gamma Sterile (185 s) → Orthopedic Hospital Kits.SUPPLIERTi-6Al-4V ELIMedical PowderI1.70 d1EBM PorousTrabecular MeltC/T 158 sI1.50 d25-Axis InnerTaper Finish CNCC/T 176 sI1.90 d3HydroxylapatitePlasma CoatC/T 243 sI1.00 d4CleanroomUltrasonic PassivC/T 162 sI2.40 d5Double Blister &Gamma SterileC/T 185 sI2.00 dCUSTOMEROrthopedicHospital Kits240 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. EBM Porous Trabecular Melt158 s30 min94%98.5%240408 (1.70 d)306
2. 5-Axis Inner Taper Finish CNC176 s25 min92%97.8%192360 (1.50 d)266
3. Hydroxylapatite Plasma Coat243 s20 min86%94.8%120456 (1.90 d)173
4. Cleanroom Ultrasonic Passiv162 s12 min95%98.9%96240 (1.00 d)303
5. Double Blister & Gamma Sterile185 s15 min92%98.4%360576 (2.40 d)261

Key figures

Takt time
225 s
Lead time
10.5 d
Value-added time
924 s
Process cycle efficiency (PCE)
0.16%
Rolled throughput yield (RTY)
88.9%
Customer demand per day
240 units
Line capacity per day
173 units
Bottleneck
Hydroxylapatite Plasma Coat

Reading the bottleneck

The bottleneck is "Hydroxylapatite Plasma Coat": it can process 173 units per day against a demand of 240 units, so it falls short of demand by 27.9%. Once downtime and scrap are counted, its cycle time grows from 243 s to 298 s, against a takt of 225 s. The largest loss at this step is equipment downtime (uptime 86%), about 39.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.