Rechargeable RIC Digital Hearing Aid Micro-Shell

Product family: SLA Printed Custom Acoustics.

Flow: Receivers & DSP Suppliers → Micro-Flex 4-Layer SMT → LSR SLA Custom Shell Print → Receiver Tube & Wax Guard Fit → Anechoic Acoustic Gain Curve → Laser UDI & Charging Case → Audiology Dispensing Chains

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Rechargeable RIC Digital Hearing Aid Micro-ShellSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Receivers & DSP Suppliers → Micro-Flex 4-Layer SMT (27.0 s) → LSR SLA Custom Shell Print (30.1 s) → Receiver Tube & Wax Guard Fit (42.0 s) → Anechoic Acoustic Gain Curve (27.8 s) → Laser UDI & Charging Case (31.6 s) → Audiology Dispensing Chains.SUPPLIERReceivers & DSPSuppliersI1.70 d1Micro-Flex4-Layer SMTC/T 27.0 sI1.50 d2LSR SLA CustomShell PrintC/T 30.1 sI1.90 d3Receiver Tube &Wax Guard FitC/T 42.0 sI1.00 d4Anechoic AcousticGain CurveC/T 27.8 sI2.40 d5Laser UDI &Charging CaseC/T 31.6 sI2.00 dCUSTOMERAudiologyDispensing…1,400 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Micro-Flex 4-Layer SMT27.0 s30 min94%98.5%1,4002,380 (1.70 d)1,790
2. LSR SLA Custom Shell Print30.1 s25 min92%97.8%1,1202,100 (1.50 d)1,558
3. Receiver Tube & Wax Guard Fit42.0 s20 min86%94.8%7002,660 (1.90 d)1,002
4. Anechoic Acoustic Gain Curve27.8 s12 min95%98.9%5601,400 (1.00 d)1,764
5. Laser UDI & Charging Case31.6 s15 min92%98.4%2,1003,360 (2.40 d)1,530

Key figures

Takt time
38.6 s
Lead time
10.5 d
Value-added time
159 s
Process cycle efficiency (PCE)
0.028%
Rolled throughput yield (RTY)
88.9%
Customer demand per day
1,400 units
Line capacity per day
1,002 units
Bottleneck
Receiver Tube & Wax Guard Fit

Reading the bottleneck

The bottleneck is "Receiver Tube & Wax Guard Fit": it can process 1,002 units per day against a demand of 1,400 units, so it falls short of demand by 28.5%. Once downtime and scrap are counted, its cycle time grows from 42.0 s to 51.5 s, against a takt of 38.6 s. The largest loss at this step is equipment downtime (uptime 86%), about 6.8 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.