Reusable Silicone Pediatric SpO2 Finger Sensor

Product family: Dual-Wavelength Red/IR Clips.

Flow: 660nm / 905nm Photo LEDs → Dual-LED Micro-Lead Soldering → Shielded TPU Cable Terminate → LSR Liquid Silicone Overmold → Red/IR Spectral Ratio Check → Clean Pouch Seal & Bulk Box → Hospital ICU Supplies

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Reusable Silicone Pediatric SpO2 Finger SensorSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. 660nm / 905nm Photo LEDs → Dual-LED Micro-Lead Soldering (11.8 s) → Shielded TPU Cable Terminate (13.2 s) → LSR Liquid Silicone Overmold (18.2 s) → Red/IR Spectral Ratio Check (12.2 s) → Clean Pouch Seal & Bulk Box (13.8 s) → Hospital ICU Supplies.SUPPLIER660nm / 905nmPhoto LEDsI1.70 d1Dual-LEDMicro-Lead…C/T 11.8 sI1.50 d2Shielded TPUCable TerminateC/T 13.2 sI1.90 d3LSR LiquidSilicone OvermoldC/T 18.2 sI1.00 d4Red/IR SpectralRatio CheckC/T 12.2 sI2.40 d5Clean Pouch Seal& Bulk BoxC/T 13.8 sI2.00 dCUSTOMERHospital ICUSupplies3,200 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Dual-LED Micro-Lead Soldering11.8 s30 min94%98.5%3,2005,440 (1.70 d)4,096
2. Shielded TPU Cable Terminate13.2 s25 min92%97.8%2,5604,800 (1.50 d)3,553
3. LSR Liquid Silicone Overmold18.2 s20 min86%94.8%1,6006,080 (1.90 d)2,311
4. Red/IR Spectral Ratio Check12.2 s12 min95%98.9%1,2803,200 (1.00 d)4,020
5. Clean Pouch Seal & Bulk Box13.8 s15 min92%98.4%4,8007,680 (2.40 d)3,503

Key figures

Takt time
16.9 s
Lead time
10.5 d
Value-added time
69.2 s
Process cycle efficiency (PCE)
0.012%
Rolled throughput yield (RTY)
88.9%
Customer demand per day
3,200 units
Line capacity per day
2,311 units
Bottleneck
LSR Liquid Silicone Overmold

Reading the bottleneck

The bottleneck is "LSR Liquid Silicone Overmold": it can process 2,311 units per day against a demand of 3,200 units, so it falls short of demand by 27.8%. Once downtime and scrap are counted, its cycle time grows from 18.2 s to 22.3 s, against a takt of 16.9 s. The largest loss at this step is equipment downtime (uptime 86%), about 3.0 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.