Tubeless Wearable Micro-Fluidic Patch Pump

Product family: 3-Day Waterproof Pods.

Flow: Memory-Shape Nitnol Wires → Cyclic Olefin Micro-Molding → Shape-Memory Drive & Cannula → Micro-PCB Glue & Ultrasonic → Waterproof IPX8 Decay Test → Sterile Blister & EtO Lot Release → Diabetes Care Channels

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Tubeless Wearable Micro-Fluidic Patch PumpSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Memory-Shape Nitnol Wires → Cyclic Olefin Micro-Molding (13.5 s) → Shape-Memory Drive & Cannula (15.0 s) → Micro-PCB Glue & Ultrasonic (20.8 s) → Waterproof IPX8 Decay Test (13.9 s) → Sterile Blister & EtO Lot Release (15.8 s) → Diabetes Care Channels.SUPPLIERMemory-ShapeNitnol WiresI1.70 d1Cyclic OlefinMicro-MoldingC/T 13.5 sI1.50 d2Shape-MemoryDrive & CannulaC/T 15.0 sI1.90 d3Micro-PCB Glue &UltrasonicC/T 20.8 sI1.00 d4Waterproof IPX8Decay TestC/T 13.9 sI2.40 d5Sterile Blister &EtO Lot ReleaseC/T 15.8 sI2.00 dCUSTOMERDiabetes CareChannels4,200 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Cyclic Olefin Micro-Molding13.5 s30 min94%98.5%4,2007,140 (1.70 d)5,432
2. Shape-Memory Drive & Cannula15.0 s25 min92%97.8%3,3606,300 (1.50 d)4,746
3. Micro-PCB Glue & Ultrasonic20.8 s20 min86%94.8%2,1007,980 (1.90 d)3,081
4. Waterproof IPX8 Decay Test13.9 s12 min95%98.9%1,6804,200 (1.00 d)5,353
5. Sterile Blister & EtO Lot Release15.8 s15 min92%98.4%6,30010,080 (2.40 d)4,607

Key figures

Takt time
19.3 s
Lead time
10.5 d
Value-added time
79.0 s
Process cycle efficiency (PCE)
0.009%
Rolled throughput yield (RTY)
88.9%
Customer demand per day
4,200 units
Line capacity per day
3,081 units
Bottleneck
Micro-PCB Glue & Ultrasonic

Reading the bottleneck

The bottleneck is "Micro-PCB Glue & Ultrasonic": it can process 3,081 units per day against a demand of 4,200 units, so it falls short of demand by 26.6%. Once downtime and scrap are counted, its cycle time grows from 20.8 s to 25.5 s, against a takt of 19.3 s. The largest loss at this step is equipment downtime (uptime 86%), about 3.4 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Implantable & Surgical MedTech: Implantable & Surgical MedTech