Hydrophobic Acrylic Foldable Cataract IOL

Product family: Aspheric Toric Eye Implants.

Flow: Acrylic Button Suppliers → Cryo Diamond Single-Point Turn → 48h Extraction Tumble Polish → Diopter Power Interferometer → BSS Vial Hydration Autoclave → Microscopic Cosmetic Inspection → Ophthalmic Eye Clinics

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Hydrophobic Acrylic Foldable Cataract IOLSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Acrylic Button Suppliers → Cryo Diamond Single-Point Turn (21.0 s) → 48h Extraction Tumble Polish (23.4 s) → Diopter Power Interferometer (32.4 s) → BSS Vial Hydration Autoclave (21.6 s) → Microscopic Cosmetic Inspection (24.6 s) → Ophthalmic Eye Clinics.SUPPLIERAcrylic ButtonSuppliersI1.70 d1Cryo DiamondSingle-Point TurnC/T 21.0 sI1.50 d248h ExtractionTumble PolishC/T 23.4 sI1.90 d3Diopter PowerInterferometerC/T 32.4 sI1.00 d4BSS VialHydration…C/T 21.6 sI2.40 d5MicroscopicCosmetic…C/T 24.6 sI2.00 dCUSTOMEROphthalmic EyeClinics1,800 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Cryo Diamond Single-Point Turn21.0 s30 min94%98.5%1,8003,060 (1.70 d)2,302
2. 48h Extraction Tumble Polish23.4 s25 min92%97.8%1,4402,700 (1.50 d)2,004
3. Diopter Power Interferometer32.4 s20 min86%94.8%9003,420 (1.90 d)1,298
4. BSS Vial Hydration Autoclave21.6 s12 min95%98.9%7201,800 (1.00 d)2,271
5. Microscopic Cosmetic Inspection24.6 s15 min92%98.4%2,7004,320 (2.40 d)1,965

Key figures

Takt time
30.0 s
Lead time
10.5 d
Value-added time
123 s
Process cycle efficiency (PCE)
0.022%
Rolled throughput yield (RTY)
88.9%
Customer demand per day
1,800 units
Line capacity per day
1,298 units
Bottleneck
Diopter Power Interferometer

Reading the bottleneck

The bottleneck is "Diopter Power Interferometer": it can process 1,298 units per day against a demand of 1,800 units, so it falls short of demand by 27.9%. Once downtime and scrap are counted, its cycle time grows from 32.4 s to 39.7 s, against a takt of 30.0 s. The largest loss at this step is equipment downtime (uptime 86%), about 5.3 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Implantable & Surgical MedTech: Implantable & Surgical MedTech