Closed-System Vacuum PMMA Bone Cement Mixer

Product family: Antibiotic Arthroplasty Mixers.

Flow: PMMA Polymer Supplier → Powder & Ampoule Gamma Fill → Vacuum Paddle Cartridge Fit → Sterile Double-Barrier Pouch → EtO Gas Terminal Sterilize → Sterility Assay & Trace Code → Orthopedic Trauma Suites

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Closed-System Vacuum PMMA Bone Cement MixerSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. PMMA Polymer Supplier → Powder & Ampoule Gamma Fill (34.4 s) → Vacuum Paddle Cartridge Fit (38.3 s) → Sterile Double-Barrier Pouch (53.0 s) → EtO Gas Terminal Sterilize (35.3 s) → Sterility Assay & Trace Code (40.0 s) → Orthopedic Trauma Suites.SUPPLIERPMMA PolymerSupplierI1.70 d1Powder & AmpouleGamma FillC/T 34.4 sI1.50 d2Vacuum PaddleCartridge FitC/T 38.3 sI1.90 d3SterileDouble-Barrier…C/T 53.0 sI1.00 d4EtO Gas TerminalSterilizeC/T 35.3 sI2.40 d5Sterility Assay &Trace CodeC/T 40.0 sI2.00 dCUSTOMEROrthopedicTrauma Suites1,100 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Powder & Ampoule Gamma Fill34.4 s30 min94%98.5%1,1001,870 (1.70 d)1,405
2. Vacuum Paddle Cartridge Fit38.3 s25 min92%97.8%8801,650 (1.50 d)1,225
3. Sterile Double-Barrier Pouch53.0 s20 min86%94.8%5502,090 (1.90 d)794
4. EtO Gas Terminal Sterilize35.3 s12 min95%98.9%4401,100 (1.00 d)1,389
5. Sterility Assay & Trace Code40.0 s15 min92%98.4%1,6502,640 (2.40 d)1,209

Key figures

Takt time
49.1 s
Lead time
10.5 d
Value-added time
201 s
Process cycle efficiency (PCE)
0.035%
Rolled throughput yield (RTY)
88.9%
Customer demand per day
1,100 units
Line capacity per day
794 units
Bottleneck
Sterile Double-Barrier Pouch

Reading the bottleneck

The bottleneck is "Sterile Double-Barrier Pouch": it can process 794 units per day against a demand of 1,100 units, so it falls short of demand by 27.8%. Once downtime and scrap are counted, its cycle time grows from 53.0 s to 65.0 s, against a takt of 49.1 s. The largest loss at this step is equipment downtime (uptime 86%), about 8.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.