Blow-Fill-Seal (BFS) Single-Dose Inhalation Ampoule

Product family: Aseptic Respiratory Nebules.

Flow: LDPE Resin Supplier → 0.2um Sterile Air Filter → Continuous BFS Mold-Fill-Seal → High-Voltage Pinhole Deflash → Die-Cut 5-Strip Perforation → Aluminum Foil Flowpack Pouch → Respiratory & OTC Chains

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Blow-Fill-Seal (BFS) Single-Dose Inhalation AmpouleSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. LDPE Resin Supplier → 0.2um Sterile Air Filter (1.2 s) → Continuous BFS Mold-Fill-Seal (1.3 s) → High-Voltage Pinhole Deflash (1.2 s) → Die-Cut 5-Strip Perforation (1.2 s) → Aluminum Foil Flowpack Pouch (1.2 s) → Respiratory & OTC Chains.SUPPLIERLDPE ResinSupplierI1.40 d10.2um Sterile AirFilterC/T 1.2 sI2.20 d2Continuous BFSMold-Fill-SealC/T 1.3 sI1.30 d3High-VoltagePinhole DeflashC/T 1.2 sI1.00 d4Die-Cut 5-StripPerforationC/T 1.2 sI2.40 d5Aluminum FoilFlowpack PouchC/T 1.2 sI1.50 dCUSTOMERRespiratory &OTC Chains65,000 / vials

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 0.2um Sterile Air Filter1.2 s45 min95%99.4%65,00091,000 (1.40 d)61,616
2. Continuous BFS Mold-Fill-Seal1.3 s95 min82%95.8%65,000143,000 (2.20 d)45,502
3. High-Voltage Pinhole Deflash1.2 s25 min92%96.8%32,50084,500 (1.30 d)57,886
4. Die-Cut 5-Strip Perforation1.2 s20 min95%99.1%26,00065,000 (1.00 d)61,194
5. Aluminum Foil Flowpack Pouch1.2 s10 min93%98.5%65,000156,000 (2.40 d)61,375

Key figures

Takt time
1.2 s
Lead time
9.80 d
Value-added time
6.1 s
Process cycle efficiency (PCE)
0.001%
Rolled throughput yield (RTY)
90.0%
Customer demand per day
65,000 vials
Line capacity per day
45,502 vials
Bottleneck
Continuous BFS Mold-Fill-Seal

Reading the bottleneck

The bottleneck is "Continuous BFS Mold-Fill-Seal": it can process 45,502 vials per day against a demand of 65,000 vials, so it falls short of demand by 30.0%. Once downtime and scrap are counted, its cycle time grows from 1.3 s to 1.7 s, against a takt of 1.2 s. The largest loss at this step is equipment downtime (uptime 82%), about 0.3 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Sterile Injectable & Aseptic GMP: Sterile Injectable & Aseptic GMP