2mL OPC Glass Ampoule Flame-Seal Line

Product family: Parenteral Anesthesia Ampoules.

Flow: Clear Glass Ampoule Supplier → Ultrasonic WFI Tunnel Wash → Depyrogenation 320°C Tunnel → N2 Purge Fill & Flame Pull → HVLD Electrical Cracks Check → PVC Tray Blister & Carton → Hospital Operating Rooms

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 2mL OPC Glass Ampoule Flame-Seal LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Clear Glass Ampoule Supplier → Ultrasonic WFI Tunnel Wash (1.2 s) → Depyrogenation 320°C Tunnel (1.8 s) → N2 Purge Fill & Flame Pull (1.3 s) → HVLD Electrical Cracks Check (1.2 s) → PVC Tray Blister & Carton (1.4 s) → Hospital Operating Rooms.SUPPLIERClear GlassAmpouleSupplierI1.40 d1Ultrasonic WFITunnel WashC/T 1.2 sI2.20 d2Depyrogenation320°C TunnelC/T 1.8 sI1.30 d3N2 Purge Fill &Flame PullC/T 1.3 sI1.00 d4HVLD ElectricalCracks CheckC/T 1.2 sI2.40 d5PVC Tray Blister& CartonC/T 1.4 sI1.50 dCUSTOMERHospitalOperating Rooms48,000 / vials

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Ultrasonic WFI Tunnel Wash1.2 s45 min95%99.4%48,00067,200 (1.40 d)61,616
2. Depyrogenation 320°C Tunnel1.8 s95 min82%95.8%48,000105,600 (2.20 d)32,863
3. N2 Purge Fill & Flame Pull1.3 s25 min92%96.8%24,00062,400 (1.30 d)53,434
4. HVLD Electrical Cracks Check1.2 s20 min95%99.1%19,20048,000 (1.00 d)61,194
5. PVC Tray Blister & Carton1.4 s10 min93%98.5%48,000115,200 (2.40 d)52,607

Key figures

Takt time
1.7 s
Lead time
9.80 d
Value-added time
6.9 s
Process cycle efficiency (PCE)
0.001%
Rolled throughput yield (RTY)
90.0%
Customer demand per day
48,000 vials
Line capacity per day
32,863 vials
Bottleneck
Depyrogenation 320°C Tunnel

Reading the bottleneck

The bottleneck is "Depyrogenation 320°C Tunnel": it can process 32,863 vials per day against a demand of 48,000 vials, so it falls short of demand by 31.5%. Once downtime and scrap are counted, its cycle time grows from 1.8 s to 2.3 s, against a takt of 1.7 s. The largest loss at this step is equipment downtime (uptime 82%), about 0.4 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.