Preservative-Free Ophthalmic Eye Dropper

Product family: Multi-Dose Dropper Bottles.

Flow: Ophthalmic Tip Suppliers → Sterile Micro-Filtration → Isolator Bottle & Tip Press → Torque Capping & Tamper Ring → Induction Seal & Vision OCR → Carton Insert & Bundling → Retail Pharmacies

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Preservative-Free Ophthalmic Eye DropperSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Ophthalmic Tip Suppliers → Sterile Micro-Filtration (1.7 s) → Isolator Bottle & Tip Press (2.7 s) → Torque Capping & Tamper Ring (1.9 s) → Induction Seal & Vision OCR (1.6 s) → Carton Insert & Bundling (2.0 s) → Retail Pharmacies.SUPPLIEROphthalmic TipSuppliersI1.40 d1SterileMicro-FiltrationC/T 1.7 sI2.20 d2Isolator Bottle &Tip PressC/T 2.7 sI1.30 d3Torque Capping &Tamper RingC/T 1.9 sI1.00 d4Induction Seal &Vision OCRC/T 1.6 sI2.40 d5Carton Insert &BundlingC/T 2.0 sI1.50 dCUSTOMERRetailPharmacies22,000 / vials

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Sterile Micro-Filtration1.7 s45 min95%99.4%22,00030,800 (1.40 d)28,496
2. Isolator Bottle & Tip Press2.7 s95 min82%95.8%22,00048,400 (2.20 d)14,053
3. Torque Capping & Tamper Ring1.9 s25 min92%96.8%11,00028,600 (1.30 d)23,905
4. Induction Seal & Vision OCR1.6 s20 min95%99.1%8,80022,000 (1.00 d)30,009
5. Carton Insert & Bundling2.0 s10 min93%98.5%22,00052,800 (2.40 d)24,459

Key figures

Takt time
2.5 s
Lead time
9.80 d
Value-added time
9.9 s
Process cycle efficiency (PCE)
0.002%
Rolled throughput yield (RTY)
90.0%
Customer demand per day
22,000 vials
Line capacity per day
14,053 vials
Bottleneck
Isolator Bottle & Tip Press

Reading the bottleneck

The bottleneck is "Isolator Bottle & Tip Press": it can process 14,053 vials per day against a demand of 22,000 vials, so it falls short of demand by 36.1%. Once downtime and scrap are counted, its cycle time grows from 2.7 s to 3.4 s, against a takt of 2.5 s. The largest loss at this step is equipment downtime (uptime 82%), about 0.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.