3mL Glass Cartridge & Disposable Insulin Pen

Product family: GLP-1 / Insulin Injector Pens.

Flow: Glass Cartridge Suppliers → Aseptic Cartridge Fill/Crimp → 100% Visual Bubble & Crack → Pen Mechanics Plunger Clip → Torque, Dose & Click Check → FMD Serialization & Cold Pack → Global Diabetes Distribution

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 3mL Glass Cartridge & Disposable Insulin PenSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Glass Cartridge Suppliers → Aseptic Cartridge Fill/Crimp (1.7 s) → 100% Visual Bubble & Crack (2.7 s) → Pen Mechanics Plunger Clip (2.0 s) → Torque, Dose & Click Check (1.6 s) → FMD Serialization & Cold Pack (2.0 s) → Global Diabetes Distribution.SUPPLIERGlass CartridgeSuppliersI1.40 d1Aseptic CartridgeFill/CrimpC/T 1.7 sI2.20 d2100% VisualBubble & CrackC/T 2.7 sI1.30 d3Pen MechanicsPlunger ClipC/T 2.0 sI1.00 d4Torque, Dose &Click CheckC/T 1.6 sI2.40 d5FMD Serialization& Cold PackC/T 2.0 sI1.50 dCUSTOMERGlobal DiabetesDistribution32,000 / vials

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Aseptic Cartridge Fill/Crimp1.7 s45 min95%99.4%32,00044,800 (1.40 d)43,493
2. 100% Visual Bubble & Crack2.7 s95 min82%95.8%32,00070,400 (2.20 d)21,908
3. Pen Mechanics Plunger Clip2.0 s25 min92%96.8%16,00041,600 (1.30 d)34,732
4. Torque, Dose & Click Check1.6 s20 min95%99.1%12,80032,000 (1.00 d)45,896
5. FMD Serialization & Cold Pack2.0 s10 min93%98.5%32,00076,800 (2.40 d)36,825

Key figures

Takt time
2.5 s
Lead time
9.80 d
Value-added time
10.0 s
Process cycle efficiency (PCE)
0.001%
Rolled throughput yield (RTY)
90.0%
Customer demand per day
32,000 vials
Line capacity per day
21,908 vials
Bottleneck
100% Visual Bubble & Crack

Reading the bottleneck

The bottleneck is "100% Visual Bubble & Crack": it can process 21,908 vials per day against a demand of 32,000 vials, so it falls short of demand by 31.5%. Once downtime and scrap are counted, its cycle time grows from 2.7 s to 3.4 s, against a takt of 2.5 s. The largest loss at this step is equipment downtime (uptime 82%), about 0.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.