Oncology Cytotoxic Lyophilized Powder Vial

Product family: Freeze-Dried Chemo Vials.

Flow: Amber Glass Vial Suppliers → OEB-5 Negative Compounding → Half-Stopper Aseptic Fill → 48h Auto-Load Freeze Dryer → Vial Washer & Flip Cap Seal → 100% High-Voltage Leak Test → Oncology Hospital Hubs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Oncology Cytotoxic Lyophilized Powder VialSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Amber Glass Vial Suppliers → OEB-5 Negative Compounding (7.7 s) → Half-Stopper Aseptic Fill (12.2 s) → 48h Auto-Load Freeze Dryer (8.8 s) → Vial Washer & Flip Cap Seal (7.2 s) → 100% High-Voltage Leak Test (9.0 s) → Oncology Hospital Hubs.SUPPLIERAmber GlassVial SuppliersI1.40 d1OEB-5 NegativeCompoundingC/T 7.7 sI2.20 d2Half-StopperAseptic FillC/T 12.2 sI1.30 d348h Auto-LoadFreeze DryerC/T 8.8 sI1.00 d4Vial Washer &Flip Cap SealC/T 7.2 sI2.40 d5100% High-VoltageLeak TestC/T 9.0 sI1.50 dCUSTOMEROncologyHospital Hubs4,800 / vials

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. OEB-5 Negative Compounding7.7 s45 min95%99.4%4,8006,720 (1.40 d)6,291
2. Half-Stopper Aseptic Fill12.2 s95 min82%95.8%4,80010,560 (2.20 d)3,110
3. 48h Auto-Load Freeze Dryer8.8 s25 min92%96.8%2,4006,240 (1.30 d)5,161
4. Vial Washer & Flip Cap Seal7.2 s20 min95%99.1%1,9204,800 (1.00 d)6,669
5. 100% High-Voltage Leak Test9.0 s10 min93%98.5%4,80011,520 (2.40 d)5,435

Key figures

Takt time
11.3 s
Lead time
9.80 d
Value-added time
44.9 s
Process cycle efficiency (PCE)
0.008%
Rolled throughput yield (RTY)
90.0%
Customer demand per day
4,800 vials
Line capacity per day
3,110 vials
Bottleneck
Half-Stopper Aseptic Fill

Reading the bottleneck

The bottleneck is "Half-Stopper Aseptic Fill": it can process 3,110 vials per day against a demand of 4,800 vials, so it falls short of demand by 35.2%. Once downtime and scrap are counted, its cycle time grows from 12.2 s to 15.5 s, against a takt of 11.3 s. The largest loss at this step is equipment downtime (uptime 82%), about 2.7 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Sterile Injectable & Aseptic GMP: Sterile Injectable & Aseptic GMP