Sterile Anticoagulant Heparin Multi-Dose Vial
Product family: ICU Critical Care Heparin.
Flow: Heparin API Supplier → 0.22um Redundant Filtration → Vial Wash-Tunnel-Fill-Stopper → Steam Terminal Sterilization → Optical Particle Camera Scan → Track & Trace Carton Bundle → Acute Hospital Pharmacies
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. 0.22um Redundant Filtration | 2.6 s | 45 min | 95% | 99.4% | 14,000 | 19,600 (1.40 d) | 18,632 |
| 2. Vial Wash-Tunnel-Fill-Stopper | 4.2 s | 95 min | 82% | 95.8% | 14,000 | 30,800 (2.20 d) | 9,034 |
| 3. Steam Terminal Sterilization | 3.0 s | 25 min | 92% | 96.8% | 7,000 | 18,200 (1.30 d) | 15,140 |
| 4. Optical Particle Camera Scan | 2.5 s | 20 min | 95% | 99.1% | 5,600 | 14,000 (1.00 d) | 19,206 |
| 5. Track & Trace Carton Bundle | 3.1 s | 10 min | 93% | 98.5% | 14,000 | 33,600 (2.40 d) | 15,780 |
Key figures
- Takt time
- 3.9 s
- Lead time
- 9.80 d
- Value-added time
- 15.4 s
- Process cycle efficiency (PCE)
- 0.003%
- Rolled throughput yield (RTY)
- 90.0%
- Customer demand per day
- 14,000 vials
- Line capacity per day
- 9,034 vials
- Bottleneck
- Vial Wash-Tunnel-Fill-Stopper
Reading the bottleneck
The bottleneck is "Vial Wash-Tunnel-Fill-Stopper": it can process 9,034 vials per day against a demand of 14,000 vials, so it falls short of demand by 35.5%. Once downtime and scrap are counted, its cycle time grows from 4.2 s to 5.3 s, against a takt of 3.9 s. The largest loss at this step is equipment downtime (uptime 82%), about 0.9 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Sterile Injectable & Aseptic GMP: Sterile Injectable & Aseptic GMP
- Sterile Vial Fill-Finish & QC Release
- RTU Pre-Filled Glass Syringe Aseptic Line
- Oncology Cytotoxic Lyophilized Powder Vial
- Preservative-Free Ophthalmic Eye Dropper
- 1000mL PP Intravenous IV Infusion Bag Line
- 3mL Glass Cartridge & Disposable Insulin Pen
- Blow-Fill-Seal (BFS) Single-Dose Inhalation Ampoule
- mRNA Lipid Nanoparticle (LNP) Ultra-Cold Vial
- 2mL OPC Glass Ampoule Flame-Seal Line
- CT/MRI Gadolinium Contrast Polymer Bottle
- Pre-Mixed Sterile Pain Management Mini-Bag