RTU Pre-Filled Glass Syringe Aseptic Line

Product family: 1mL Staked-Needle Syringes.

Flow: Nested Glass Syringe Tubs → Tub Decontamination Airlock → Isolator Vacuum Stopper Fill → Plunger Rod & Backstop Fit → Automated Particle Mirage → Thermal Blister & 2D Code → Biologics Chronic Care

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: RTU Pre-Filled Glass Syringe Aseptic LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Nested Glass Syringe Tubs → Tub Decontamination Airlock (2.0 s) → Isolator Vacuum Stopper Fill (3.2 s) → Plunger Rod & Backstop Fit (2.3 s) → Automated Particle Mirage (1.9 s) → Thermal Blister & 2D Code (2.4 s) → Biologics Chronic Care.SUPPLIERNested GlassSyringe TubsI1.40 d1TubDecontamination…C/T 2.0 sI2.20 d2Isolator VacuumStopper FillC/T 3.2 sI1.30 d3Plunger Rod &Backstop FitC/T 2.3 sI1.00 d4AutomatedParticle MirageC/T 1.9 sI2.40 d5Thermal Blister &2D CodeC/T 2.4 sI1.50 dCUSTOMERBiologicsChronic Care18,000 / vials

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Tub Decontamination Airlock2.0 s45 min95%99.4%18,00025,200 (1.40 d)24,221
2. Isolator Vacuum Stopper Fill3.2 s95 min82%95.8%18,00039,600 (2.20 d)11,857
3. Plunger Rod & Backstop Fit2.3 s25 min92%96.8%9,00023,400 (1.30 d)19,747
4. Automated Particle Mirage1.9 s20 min95%99.1%7,20018,000 (1.00 d)25,271
5. Thermal Blister & 2D Code2.4 s10 min93%98.5%18,00043,200 (2.40 d)20,382

Key figures

Takt time
3.0 s
Lead time
9.80 d
Value-added time
11.8 s
Process cycle efficiency (PCE)
0.002%
Rolled throughput yield (RTY)
90.0%
Customer demand per day
18,000 vials
Line capacity per day
11,857 vials
Bottleneck
Isolator Vacuum Stopper Fill

Reading the bottleneck

The bottleneck is "Isolator Vacuum Stopper Fill": it can process 11,857 vials per day against a demand of 18,000 vials, so it falls short of demand by 34.1%. Once downtime and scrap are counted, its cycle time grows from 3.2 s to 4.1 s, against a takt of 3.0 s. The largest loss at this step is equipment downtime (uptime 82%), about 0.7 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.