Sterile Vial Fill-Finish & QC Release

Product family: 10 mL Injectable Vials.

Flow: Glass Vial & API Suppliers → Sterile Compounding → Aseptic Fill & Lyophilize → Capping & Optical QC → Serialization & Carton → QP Quarantine Release → Hospital & Cold Wholesalers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Sterile Vial Fill-Finish & QC ReleaseSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Glass Vial & API Suppliers → Sterile Compounding (3.1 s) → Aseptic Fill & Lyophilize (4.9 s) → Capping & Optical QC (3.5 s) → Serialization & Carton (2.9 s) → QP Quarantine Release (3.6 s) → Hospital & Cold Wholesalers.SUPPLIERGlass Vial &API SuppliersI1.40 d1SterileCompoundingC/T 3.1 sI2.20 d2Aseptic Fill &LyophilizeC/T 4.9 sI1.30 d3Capping & OpticalQCC/T 3.5 sI1.00 d4Serialization &CartonC/T 2.9 sI2.40 d5QP QuarantineReleaseC/T 3.6 sI1.50 dCUSTOMERHospital & ColdWholesalers12,000 / vials

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Sterile Compounding3.1 s45 min95%99.4%12,00016,800 (1.40 d)15,627
2. Aseptic Fill & Lyophilize4.9 s95 min82%95.8%12,00026,400 (2.20 d)7,743
3. Capping & Optical QC3.5 s25 min92%96.8%6,00015,600 (1.30 d)12,977
4. Serialization & Carton2.9 s20 min95%99.1%4,80012,000 (1.00 d)16,557
5. QP Quarantine Release3.6 s10 min93%98.5%12,00028,800 (2.40 d)13,588

Key figures

Takt time
4.5 s
Lead time
9.80 d
Value-added time
18.0 s
Process cycle efficiency (PCE)
0.003%
Rolled throughput yield (RTY)
90.0%
Customer demand per day
12,000 vials
Line capacity per day
7,743 vials
Bottleneck
Aseptic Fill & Lyophilize

Reading the bottleneck

The bottleneck is "Aseptic Fill & Lyophilize": it can process 7,743 vials per day against a demand of 12,000 vials, so it falls short of demand by 35.5%. Once downtime and scrap are counted, its cycle time grows from 4.9 s to 6.2 s, against a takt of 4.5 s. The largest loss at this step is equipment downtime (uptime 82%), about 1.1 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.