mRNA Lipid Nanoparticle (LNP) Ultra-Cold Vial

Product family: Multi-Dose mRNA Vaccines.

Flow: Lipid & DNA Suppliers → Microfluidic LNP Impingement → TFF Buffer Exchange -80°C → High-Speed Cryo Vial Filling → Laser Helium Headspace Test → -70°C Dry-Ice Thermal Shipper → National Immunization Hubs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: mRNA Lipid Nanoparticle (LNP) Ultra-Cold VialSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Lipid & DNA Suppliers → Microfluidic LNP Impingement (2.3 s) → TFF Buffer Exchange -80°C (3.6 s) → High-Speed Cryo Vial Filling (2.6 s) → Laser Helium Headspace Test (2.2 s) → -70°C Dry-Ice Thermal Shipper (2.7 s) → National Immunization Hubs.SUPPLIERLipid & DNASuppliersI1.40 d1Microfluidic LNPImpingementC/T 2.3 sI2.20 d2TFF BufferExchange -80°CC/T 3.6 sI1.30 d3High-Speed CryoVial FillingC/T 2.6 sI1.00 d4Laser HeliumHeadspace TestC/T 2.2 sI2.40 d5-70°C Dry-IceThermal ShipperC/T 2.7 sI1.50 dCUSTOMERNationalImmunization…16,000 / vials

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Microfluidic LNP Impingement2.3 s45 min95%99.4%16,00022,400 (1.40 d)21,062
2. TFF Buffer Exchange -80°C3.6 s95 min82%95.8%16,00035,200 (2.20 d)10,540
3. High-Speed Cryo Vial Filling2.6 s25 min92%96.8%8,00020,800 (1.30 d)17,469
4. Laser Helium Headspace Test2.2 s20 min95%99.1%6,40016,000 (1.00 d)21,825
5. -70°C Dry-Ice Thermal Shipper2.7 s10 min93%98.5%16,00038,400 (2.40 d)18,117

Key figures

Takt time
3.4 s
Lead time
9.80 d
Value-added time
13.4 s
Process cycle efficiency (PCE)
0.003%
Rolled throughput yield (RTY)
90.0%
Customer demand per day
16,000 vials
Line capacity per day
10,540 vials
Bottleneck
TFF Buffer Exchange -80°C

Reading the bottleneck

The bottleneck is "TFF Buffer Exchange -80°C": it can process 10,540 vials per day against a demand of 16,000 vials, so it falls short of demand by 34.1%. Once downtime and scrap are counted, its cycle time grows from 3.6 s to 4.6 s, against a takt of 3.4 s. The largest loss at this step is equipment downtime (uptime 82%), about 0.8 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.