Semi-Anechoic Radiated EMC / ESD Cert Cycle

Product family: CE / FCC Class-B Pre-Scan.

Flow: Accredited Test Lab Chamber → HARNESS Ferrite Baseline Prep → 10m Radiated Emission Sweep → EMI Peak Sniffer Root Fix → Contact 8kV ESD Immunity Run → Accredited CE/FCC Lab Report → Global Hardware Launches

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Semi-Anechoic Radiated EMC / ESD Cert CycleSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Accredited Test Lab Chamber → HARNESS Ferrite Baseline Prep (1,944 s) → 10m Radiated Emission Sweep (2,268 s) → EMI Peak Sniffer Root Fix (2,916 s) → Contact 8kV ESD Immunity Run (2,052 s) → Accredited CE/FCC Lab Report (1,512 s) → Global Hardware Launches.SUPPLIERAccredited TestLab ChamberI2.00 d1HARNESS FerriteBaseline PrepC/T 1,944 sI1.80 d210m RadiatedEmission SweepC/T 2,268 sI3.00 d3EMI Peak SnifferRoot FixC/T 2,916 sI1.20 d4Contact 8kV ESDImmunity RunC/T 2,052 sI0.70 d5Accredited CE/FCCLab ReportC/T 1,512 sI1.00 dCUSTOMERGlobal HardwareLaunches10 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. HARNESS Ferrite Baseline Prep1,944 s20 min94%96.5%820 (2.00 d)12
2. 10m Radiated Emission Sweep2,268 s15 min91%93.8%518 (1.80 d)9
3. EMI Peak Sniffer Root Fix2,916 s35 min83%89.5%830 (3.00 d)6
4. Contact 8kV ESD Immunity Run2,052 s12 min94%97.6%412 (1.20 d)11
5. Accredited CE/FCC Lab Report1,512 s5 min98%99.1%27 (0.70 d)16

Key figures

Takt time
2,700 s
Lead time
10.1 d
Value-added time
10,692 s
Process cycle efficiency (PCE)
3.9%
Rolled throughput yield (RTY)
78.4%
Customer demand per day
10 cases
Line capacity per day
6 cases
Bottleneck
EMI Peak Sniffer Root Fix

Reading the bottleneck

The bottleneck is "EMI Peak Sniffer Root Fix": it can process 6 cases per day against a demand of 10 cases, so it falls short of demand by 37.9%. Once downtime and scrap are counted, its cycle time grows from 2,916 s to 3,925 s, against a takt of 2,700 s. The largest loss at this step is equipment downtime (uptime 83%), about 597 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.