5-Day Quick-Turn 12-Layer Hardware Proto Spin

Product family: R&D EVT Engineering Samples.

Flow: Quick-turn PCB fabricators → DFM / DFA Gerber Auto-Check → 48h Bare PCB Express Fab → Kitting Missing-Part Sourcing → Prototype Bench SMT + X-Ray → Bench Power-Up & Scope Test → Hardware R&D Engineers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 5-Day Quick-Turn 12-Layer Hardware Proto SpinSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Quick-turn PCB fabricators → DFM / DFA Gerber Auto-Check (810 s) → 48h Bare PCB Express Fab (945 s) → Kitting Missing-Part Sourcing (1,215 s) → Prototype Bench SMT + X-Ray (855 s) → Bench Power-Up & Scope Test (630 s) → Hardware R&D Engineers.SUPPLIERQuick-turn PCBfabricatorsI2.00 d1DFM / DFA GerberAuto-CheckC/T 810 sI1.79 d248h Bare PCBExpress FabC/T 945 sI3.00 d3KittingMissing-Part…C/T 1,215 sI1.21 d4Prototype BenchSMT + X-RayC/T 855 sI0.71 d5Bench Power-Up &Scope TestC/T 630 sI1.00 dCUSTOMERHardware R&DEngineers24 / boards

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. DFM / DFA Gerber Auto-Check810 s20 min94%96.5%1948 (2.00 d)29
2. 48h Bare PCB Express Fab945 s15 min91%93.8%1243 (1.79 d)23
3. Kitting Missing-Part Sourcing1,215 s35 min83%89.5%1972 (3.00 d)15
4. Prototype Bench SMT + X-Ray855 s12 min94%97.6%1029 (1.21 d)27
5. Bench Power-Up & Scope Test630 s5 min98%99.1%517 (0.71 d)39

Key figures

Takt time
1,125 s
Lead time
9.87 d
Value-added time
4,455 s
Process cycle efficiency (PCE)
1.7%
Rolled throughput yield (RTY)
78.4%
Customer demand per day
24 boards
Line capacity per day
15 boards
Bottleneck
Kitting Missing-Part Sourcing

Reading the bottleneck

The bottleneck is "Kitting Missing-Part Sourcing": it can process 15 boards per day against a demand of 24 boards, so it falls short of demand by 38.0%. Once downtime and scrap are counted, its cycle time grows from 1,215 s to 1,636 s, against a takt of 1,125 s. The largest loss at this step is equipment downtime (uptime 83%), about 249 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Hardware R&D, Prototyping & Compliance: Hardware R&D, Prototyping & Compliance