Thermal Dissipation Vapor-Chamber Wind Tunnel
Product family: IR Thermal Margin Sign-Off.
Flow: Macro IR & Airflow Rig → Thermocouple Matrix Epoxied → Closed-Loop Airflow Sweep → IR Radiometric Map Capture → TIM Paste Thickness Iterate → Throttle Margin Sign-Off → Server & Laptop R&D
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Thermocouple Matrix Epoxied | 1,215 s | 20 min | 94% | 96.5% | 13 | 32 (2.00 d) | 19 |
| 2. Closed-Loop Airflow Sweep | 1,418 s | 15 min | 91% | 93.8% | 8 | 29 (1.81 d) | 15 |
| 3. IR Radiometric Map Capture | 1,823 s | 35 min | 83% | 89.5% | 13 | 48 (3.00 d) | 10 |
| 4. TIM Paste Thickness Iterate | 1,283 s | 12 min | 94% | 97.6% | 6 | 19 (1.19 d) | 18 |
| 5. Throttle Margin Sign-Off | 945 s | 5 min | 98% | 99.1% | 3 | 11 (0.69 d) | 26 |
Key figures
- Takt time
- 1,688 s
- Lead time
- 9.94 d
- Value-added time
- 6,684 s
- Process cycle efficiency (PCE)
- 2.5%
- Rolled throughput yield (RTY)
- 78.4%
- Customer demand per day
- 16 cases
- Line capacity per day
- 10 cases
- Bottleneck
- IR Radiometric Map Capture
Reading the bottleneck
The bottleneck is "IR Radiometric Map Capture": it can process 10 cases per day against a demand of 16 cases, so it falls short of demand by 37.8%. Once downtime and scrap are counted, its cycle time grows from 1,823 s to 2,454 s, against a takt of 1,688 s. The largest loss at this step is equipment downtime (uptime 83%), about 373 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Hardware R&D, Prototyping & Compliance: Hardware R&D, Prototyping & Compliance
- 5-Day Quick-Turn 12-Layer Hardware Proto Spin
- Semi-Anechoic Radiated EMC / ESD Cert Cycle
- HALT Highly Accelerated Thermal & Vibe Stress
- Same-Day SLA Resin & SLS Nylon Enclosure Proto
- Lithium Battery UN38.3 Air Transport Certification
- Hardware-in-Loop (HIL) Embedded Firmware Rig
- Acoustic Anechoic Smart Speaker / Mic Array Tune
- 5G / Wi-Fi 6E SAR Specific Absorption RF Test
- EVT-to-DVT Injection Tooling Steel Release Gate
- Medical Device ISTA-3A Transit & Aging Study
- Custom AR/VR Pancake Lens Optical Alignment