Lithium Battery UN38.3 Air Transport Certification

Product family: Mandatory Hazmat Lab Cycle.

Flow: Prototype Battery Packs → Altitude & Thermal Test T1–T2 → Vibration, Shock & Short T3–T5 → Crush & Overcharge Abuse T6–T7 → Drop 1.2m Package Verification → UN38.3 Test Summary Issue → Global Logistics & Customs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Lithium Battery UN38.3 Air Transport CertificationSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Prototype Battery Packs → Altitude & Thermal Test T1–T2 (3,240 s) → Vibration, Shock & Short T3–T5 (3,780 s) → Crush & Overcharge Abuse T6–T7 (4,860 s) → Drop 1.2m Package Verification (3,420 s) → UN38.3 Test Summary Issue (2,520 s) → Global Logistics & Customs.SUPPLIERPrototypeBattery PacksI2.00 d1Altitude &Thermal Test…C/T 3,240 sI1.83 d2Vibration, Shock& Short T3–T5C/T 3,780 sI3.00 d3Crush &Overcharge Abuse…C/T 4,860 sI1.17 d4Drop 1.2m PackageVerificationC/T 3,420 sI0.67 d5UN38.3 TestSummary IssueC/T 2,520 sI1.00 dCUSTOMERGlobalLogistics &…6 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Altitude & Thermal Test T1–T23,240 s20 min94%96.5%512 (2.00 d)7
2. Vibration, Shock & Short T3–T53,780 s15 min91%93.8%311 (1.83 d)6
3. Crush & Overcharge Abuse T6–T74,860 s35 min83%89.5%518 (3.00 d)4
4. Drop 1.2m Package Verification3,420 s12 min94%97.6%27 (1.17 d)7
5. UN38.3 Test Summary Issue2,520 s5 min98%99.1%14 (0.67 d)10

Key figures

Takt time
4,500 s
Lead time
10.3 d
Value-added time
17,820 s
Process cycle efficiency (PCE)
6.4%
Rolled throughput yield (RTY)
78.4%
Customer demand per day
6 cases
Line capacity per day
4 cases
Bottleneck
Crush & Overcharge Abuse T6–T7

Reading the bottleneck

The bottleneck is "Crush & Overcharge Abuse T6–T7": it can process 4 cases per day against a demand of 6 cases, so it falls short of demand by 37.6%. Once downtime and scrap are counted, its cycle time grows from 4,860 s to 6,542 s, against a takt of 4,500 s. The largest loss at this step is equipment downtime (uptime 83%), about 995 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.