EVT-to-DVT Injection Tooling Steel Release Gate

Product family: DFM Mold-Flow Freeze.

Flow: China/EU Toolmakers → Flow Gate & Warp Sim → Draft Angle & Undercut Check → Costed BOM & Tool Lead Review → Tolerance Stack-Up Sign-Off → Hard Steel P20 Tooling PO → Hardware Ops & Supply Chain

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: EVT-to-DVT Injection Tooling Steel Release GateSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. China/EU Toolmakers → Flow Gate & Warp Sim (1,944 s) → Draft Angle & Undercut Check (2,268 s) → Costed BOM & Tool Lead Review (2,916 s) → Tolerance Stack-Up Sign-Off (2,052 s) → Hard Steel P20 Tooling PO (1,512 s) → Hardware Ops & Supply Chain.SUPPLIERChina/EUToolmakersI2.00 d1Flow Gate & WarpSimC/T 1,944 sI1.80 d2Draft Angle &Undercut CheckC/T 2,268 sI3.00 d3Costed BOM & ToolLead ReviewC/T 2,916 sI1.20 d4ToleranceStack-Up Sign-OffC/T 2,052 sI0.70 d5Hard Steel P20Tooling POC/T 1,512 sI1.00 dCUSTOMERHardware Ops &Supply Chain10 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Flow Gate & Warp Sim1,944 s20 min94%96.5%820 (2.00 d)12
2. Draft Angle & Undercut Check2,268 s15 min91%93.8%518 (1.80 d)9
3. Costed BOM & Tool Lead Review2,916 s35 min83%89.5%830 (3.00 d)6
4. Tolerance Stack-Up Sign-Off2,052 s12 min94%97.6%412 (1.20 d)11
5. Hard Steel P20 Tooling PO1,512 s5 min98%99.1%27 (0.70 d)16

Key figures

Takt time
2,700 s
Lead time
10.1 d
Value-added time
10,692 s
Process cycle efficiency (PCE)
3.9%
Rolled throughput yield (RTY)
78.4%
Customer demand per day
10 cases
Line capacity per day
6 cases
Bottleneck
Costed BOM & Tool Lead Review

Reading the bottleneck

The bottleneck is "Costed BOM & Tool Lead Review": it can process 6 cases per day against a demand of 10 cases, so it falls short of demand by 37.9%. Once downtime and scrap are counted, its cycle time grows from 2,916 s to 3,925 s, against a takt of 2,700 s. The largest loss at this step is equipment downtime (uptime 83%), about 597 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Hardware R&D, Prototyping & Compliance: Hardware R&D, Prototyping & Compliance