5G / Wi-Fi 6E SAR Specific Absorption RF Test

Product family: Head/Body RF Safety Filing.

Flow: Robotic SAR Phantom Tank → Max TX Power Firmware Load → Liquid Permittivity Calibrate → 6-Axis Robot E-Field Probe → Worst-Case Band Hot-Spot Check → FCC / ISED SAR Dossier → Global Telecom Launches

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 5G / Wi-Fi 6E SAR Specific Absorption RF TestSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Robotic SAR Phantom Tank → Max TX Power Firmware Load (2,430 s) → Liquid Permittivity Calibrate (2,835 s) → 6-Axis Robot E-Field Probe (3,645 s) → Worst-Case Band Hot-Spot Check (2,565 s) → FCC / ISED SAR Dossier (1,890 s) → Global Telecom Launches.SUPPLIERRobotic SARPhantom TankI2.00 d1Max TX PowerFirmware LoadC/T 2,430 sI1.75 d2LiquidPermittivity…C/T 2,835 sI3.00 d36-Axis RobotE-Field ProbeC/T 3,645 sI1.25 d4Worst-Case BandHot-Spot CheckC/T 2,565 sI0.75 d5FCC / ISED SARDossierC/T 1,890 sI1.00 dCUSTOMERGlobal TelecomLaunches8 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Max TX Power Firmware Load2,430 s20 min94%96.5%616 (2.00 d)9
2. Liquid Permittivity Calibrate2,835 s15 min91%93.8%414 (1.75 d)8
3. 6-Axis Robot E-Field Probe3,645 s35 min83%89.5%624 (3.00 d)5
4. Worst-Case Band Hot-Spot Check2,565 s12 min94%97.6%310 (1.25 d)9
5. FCC / ISED SAR Dossier1,890 s5 min98%99.1%26 (0.75 d)13

Key figures

Takt time
3,375 s
Lead time
10.2 d
Value-added time
13,365 s
Process cycle efficiency (PCE)
4.8%
Rolled throughput yield (RTY)
78.4%
Customer demand per day
8 cases
Line capacity per day
5 cases
Bottleneck
6-Axis Robot E-Field Probe

Reading the bottleneck

The bottleneck is "6-Axis Robot E-Field Probe": it can process 5 cases per day against a demand of 8 cases, so it falls short of demand by 38.4%. Once downtime and scrap are counted, its cycle time grows from 3,645 s to 4,907 s, against a takt of 3,375 s. The largest loss at this step is equipment downtime (uptime 83%), about 747 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.