Medical Device ISTA-3A Transit & Aging Study

Product family: Accelerated Shelf-Life Cert.

Flow: Packaged Sterile Samples → ASTM F1980 55°C Aging → ISTA-3A Drop & Random Vibe → Dye Penetration Sterile Leak → Peel Force Tensile Validation → Design History File Sign-Off → FDA / MDR Submissions

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Medical Device ISTA-3A Transit & Aging StudySupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Packaged Sterile Samples → ASTM F1980 55°C Aging (1,620 s) → ISTA-3A Drop & Random Vibe (1,890 s) → Dye Penetration Sterile Leak (2,430 s) → Peel Force Tensile Validation (1,710 s) → Design History File Sign-Off (1,260 s) → FDA / MDR Submissions.SUPPLIERPackagedSterile SamplesI2.00 d1ASTM F1980 55°CAgingC/T 1,620 sI1.83 d2ISTA-3A Drop &Random VibeC/T 1,890 sI3.00 d3Dye PenetrationSterile LeakC/T 2,430 sI1.17 d4Peel ForceTensile…C/T 1,710 sI0.67 d5Design HistoryFile Sign-OffC/T 1,260 sI1.00 dCUSTOMERFDA / MDRSubmissions12 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. ASTM F1980 55°C Aging1,620 s20 min94%96.5%1024 (2.00 d)14
2. ISTA-3A Drop & Random Vibe1,890 s15 min91%93.8%622 (1.83 d)11
3. Dye Penetration Sterile Leak2,430 s35 min83%89.5%1036 (3.00 d)7
4. Peel Force Tensile Validation1,710 s12 min94%97.6%514 (1.17 d)14
5. Design History File Sign-Off1,260 s5 min98%99.1%28 (0.67 d)19

Key figures

Takt time
2,250 s
Lead time
10.00 d
Value-added time
8,910 s
Process cycle efficiency (PCE)
3.3%
Rolled throughput yield (RTY)
78.4%
Customer demand per day
12 cases
Line capacity per day
7 cases
Bottleneck
Dye Penetration Sterile Leak

Reading the bottleneck

The bottleneck is "Dye Penetration Sterile Leak": it can process 7 cases per day against a demand of 12 cases, so it falls short of demand by 37.6%. Once downtime and scrap are counted, its cycle time grows from 2,430 s to 3,271 s, against a takt of 2,250 s. The largest loss at this step is equipment downtime (uptime 83%), about 498 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.