Same-Day SLA Resin & SLS Nylon Enclosure Proto

Product family: Fit-Check Functional Mockups.

Flow: SLA & SLS Printers → Wall-Thickness & Mesh Fix → Overnight SLA/SLS Batch Print → IPA Wash, UV Cure & Dye Coat → Heat-Set Brass Insert Press → Engineer Tolerance Fit Sign → Industrial Design Teams

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Same-Day SLA Resin & SLS Nylon Enclosure ProtoSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. SLA & SLS Printers → Wall-Thickness & Mesh Fix (540 s) → Overnight SLA/SLS Batch Print (630 s) → IPA Wash, UV Cure & Dye Coat (810 s) → Heat-Set Brass Insert Press (570 s) → Engineer Tolerance Fit Sign (420 s) → Industrial Design Teams.SUPPLIERSLA & SLSPrintersI2.00 d1Wall-Thickness &Mesh FixC/T 540 sI1.81 d2Overnight SLA/SLSBatch PrintC/T 630 sI3.00 d3IPA Wash, UV Cure& Dye CoatC/T 810 sI1.19 d4Heat-Set BrassInsert PressC/T 570 sI0.69 d5EngineerTolerance Fit…C/T 420 sI1.00 dCUSTOMERIndustrialDesign Teams36 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Wall-Thickness & Mesh Fix540 s20 min94%96.5%2972 (2.00 d)43
2. Overnight SLA/SLS Batch Print630 s15 min91%93.8%1865 (1.81 d)34
3. IPA Wash, UV Cure & Dye Coat810 s35 min83%89.5%29108 (3.00 d)22
4. Heat-Set Brass Insert Press570 s12 min94%97.6%1443 (1.19 d)40
5. Engineer Tolerance Fit Sign420 s5 min98%99.1%725 (0.69 d)59

Key figures

Takt time
750 s
Lead time
9.80 d
Value-added time
2,970 s
Process cycle efficiency (PCE)
1.1%
Rolled throughput yield (RTY)
78.4%
Customer demand per day
36 units
Line capacity per day
22 units
Bottleneck
IPA Wash, UV Cure & Dye Coat

Reading the bottleneck

The bottleneck is "IPA Wash, UV Cure & Dye Coat": it can process 22 units per day against a demand of 36 units, so it falls short of demand by 37.9%. Once downtime and scrap are counted, its cycle time grows from 810 s to 1,090 s, against a takt of 750 s. The largest loss at this step is equipment downtime (uptime 83%), about 166 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.