Hardware-in-Loop (HIL) Embedded Firmware Rig
Product family: Nightly Automated Firmware Regress.
Flow: HIL Test Rig Crates → Automated Binary Target Flash → Simulated Sensor Fault Inject → CAN/LIN Bus Timing Capture → Coverage & Anomaly Alert Fix → Signed Release Candidate Tag → Firmware Control Teams
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Automated Binary Target Flash | 1,296 s | 20 min | 94% | 96.5% | 24 | 60 (2.00 d) | 37 |
| 2. Simulated Sensor Fault Inject | 1,512 s | 15 min | 91% | 93.8% | 15 | 54 (1.80 d) | 29 |
| 3. CAN/LIN Bus Timing Capture | 1,944 s | 35 min | 83% | 89.5% | 24 | 90 (3.00 d) | 20 |
| 4. Coverage & Anomaly Alert Fix | 1,368 s | 12 min | 94% | 97.6% | 12 | 36 (1.20 d) | 35 |
| 5. Signed Release Candidate Tag | 1,008 s | 5 min | 98% | 99.1% | 6 | 21 (0.70 d) | 51 |
Key figures
- Takt time
- 1,800 s
- Lead time
- 9.83 d
- Value-added time
- 7,128 s
- Process cycle efficiency (PCE)
- 1.3%
- Rolled throughput yield (RTY)
- 78.4%
- Customer demand per day
- 30 batches
- Line capacity per day
- 20 batches
- Bottleneck
- CAN/LIN Bus Timing Capture
Reading the bottleneck
The bottleneck is "CAN/LIN Bus Timing Capture": it can process 20 batches per day against a demand of 30 batches, so it falls short of demand by 34.6%. Once downtime and scrap are counted, its cycle time grows from 1,944 s to 2,617 s, against a takt of 1,800 s. The largest loss at this step is equipment downtime (uptime 83%), about 398 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Hardware R&D, Prototyping & Compliance: Hardware R&D, Prototyping & Compliance
- 5-Day Quick-Turn 12-Layer Hardware Proto Spin
- Semi-Anechoic Radiated EMC / ESD Cert Cycle
- HALT Highly Accelerated Thermal & Vibe Stress
- Same-Day SLA Resin & SLS Nylon Enclosure Proto
- Lithium Battery UN38.3 Air Transport Certification
- Acoustic Anechoic Smart Speaker / Mic Array Tune
- 5G / Wi-Fi 6E SAR Specific Absorption RF Test
- EVT-to-DVT Injection Tooling Steel Release Gate
- Medical Device ISTA-3A Transit & Aging Study
- Thermal Dissipation Vapor-Chamber Wind Tunnel
- Custom AR/VR Pancake Lens Optical Alignment