HALT Highly Accelerated Thermal & Vibe Stress

Product family: Destructive Margin Discovery.

Flow: DVT Prototype Hardware → Cold Step Stress Failure Hunt → Rapid 60°C/min Thermal Shock → 6-DOF Random Vibration Run → Root-Cause Solder/Mech Beef → Operational Limit Design Sign → Reliability Engineering

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: HALT Highly Accelerated Thermal & Vibe StressSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. DVT Prototype Hardware → Cold Step Stress Failure Hunt (2,430 s) → Rapid 60°C/min Thermal Shock (2,835 s) → 6-DOF Random Vibration Run (3,645 s) → Root-Cause Solder/Mech Beef (2,565 s) → Operational Limit Design Sign (1,890 s) → Reliability Engineering.SUPPLIERDVT PrototypeHardwareI2.00 d1Cold Step StressFailure HuntC/T 2,430 sI1.75 d2Rapid 60°C/minThermal ShockC/T 2,835 sI3.00 d36-DOF RandomVibration RunC/T 3,645 sI1.25 d4Root-CauseSolder/Mech BeefC/T 2,565 sI0.75 d5Operational LimitDesign SignC/T 1,890 sI1.00 dCUSTOMERReliabilityEngineering8 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Cold Step Stress Failure Hunt2,430 s20 min94%96.5%616 (2.00 d)9
2. Rapid 60°C/min Thermal Shock2,835 s15 min91%93.8%414 (1.75 d)8
3. 6-DOF Random Vibration Run3,645 s35 min83%89.5%624 (3.00 d)5
4. Root-Cause Solder/Mech Beef2,565 s12 min94%97.6%310 (1.25 d)9
5. Operational Limit Design Sign1,890 s5 min98%99.1%26 (0.75 d)13

Key figures

Takt time
3,375 s
Lead time
10.2 d
Value-added time
13,365 s
Process cycle efficiency (PCE)
4.8%
Rolled throughput yield (RTY)
78.4%
Customer demand per day
8 cases
Line capacity per day
5 cases
Bottleneck
6-DOF Random Vibration Run

Reading the bottleneck

The bottleneck is "6-DOF Random Vibration Run": it can process 5 cases per day against a demand of 8 cases, so it falls short of demand by 38.4%. Once downtime and scrap are counted, its cycle time grows from 3,645 s to 4,907 s, against a takt of 3,375 s. The largest loss at this step is equipment downtime (uptime 83%), about 747 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.