HALT Highly Accelerated Thermal & Vibe Stress
Product family: Destructive Margin Discovery.
Flow: DVT Prototype Hardware → Cold Step Stress Failure Hunt → Rapid 60°C/min Thermal Shock → 6-DOF Random Vibration Run → Root-Cause Solder/Mech Beef → Operational Limit Design Sign → Reliability Engineering
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Cold Step Stress Failure Hunt | 2,430 s | 20 min | 94% | 96.5% | 6 | 16 (2.00 d) | 9 |
| 2. Rapid 60°C/min Thermal Shock | 2,835 s | 15 min | 91% | 93.8% | 4 | 14 (1.75 d) | 8 |
| 3. 6-DOF Random Vibration Run | 3,645 s | 35 min | 83% | 89.5% | 6 | 24 (3.00 d) | 5 |
| 4. Root-Cause Solder/Mech Beef | 2,565 s | 12 min | 94% | 97.6% | 3 | 10 (1.25 d) | 9 |
| 5. Operational Limit Design Sign | 1,890 s | 5 min | 98% | 99.1% | 2 | 6 (0.75 d) | 13 |
Key figures
- Takt time
- 3,375 s
- Lead time
- 10.2 d
- Value-added time
- 13,365 s
- Process cycle efficiency (PCE)
- 4.8%
- Rolled throughput yield (RTY)
- 78.4%
- Customer demand per day
- 8 cases
- Line capacity per day
- 5 cases
- Bottleneck
- 6-DOF Random Vibration Run
Reading the bottleneck
The bottleneck is "6-DOF Random Vibration Run": it can process 5 cases per day against a demand of 8 cases, so it falls short of demand by 38.4%. Once downtime and scrap are counted, its cycle time grows from 3,645 s to 4,907 s, against a takt of 3,375 s. The largest loss at this step is equipment downtime (uptime 83%), about 747 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Hardware R&D, Prototyping & Compliance: Hardware R&D, Prototyping & Compliance
- 5-Day Quick-Turn 12-Layer Hardware Proto Spin
- Semi-Anechoic Radiated EMC / ESD Cert Cycle
- Same-Day SLA Resin & SLS Nylon Enclosure Proto
- Lithium Battery UN38.3 Air Transport Certification
- Hardware-in-Loop (HIL) Embedded Firmware Rig
- Acoustic Anechoic Smart Speaker / Mic Array Tune
- 5G / Wi-Fi 6E SAR Specific Absorption RF Test
- EVT-to-DVT Injection Tooling Steel Release Gate
- Medical Device ISTA-3A Transit & Aging Study
- Thermal Dissipation Vapor-Chamber Wind Tunnel
- Custom AR/VR Pancake Lens Optical Alignment